WPL Diamond DMC Скачать руководство пользователя страница 2

  

SERVICING AND MAINTENANCE

The Environment Agency requires that all sewage treatment plants are operated and 
maintained in accordance with the manufacturer’s instructions. 

In order to sustain the high performance of your Diamond plant, this User Guide/
Operation & Maintenance Manual sets out the required periodic maintenance and 
operating instructions. WPL supplies a separate Maintenance Log Book with each 
Diamond, which is designed to record the regular six monthly maintenance cycle for 
your sewage treatment plant. 

The WPL Diamond has been designed for simple tank and blower maintenance and 
WPL Ltd recommends this maintenance is carried out by a British Water Accredited, 
Quali

fi

ed Service Engineer.

It is also important that wastewater sludge from the sewage treatment plant is safely 
disposed of in an appropriate or controlled manner at the recommended intervals.

De-sludging MUST be carried out by an approved tankering company and WPL 
recommends that de-sludging is arranged with a reputable company in your area.

We recommend that you keep this manual, along with your log book, in a 
safe place on the premises where the Diamond is installed for easy reference.

Replacement Maintenance Log Books and User Guide/Operation and Maintenance 
Manuals are available by calling WPL Limited on 023 9224 2600.

WPL LIMITED SPARE PARTS

Please contact the WPL Spares Department on 023 9224 2600 for prices and 
information.

The Diamond is CE marked, fully type tested and certi

fi

cated in 

accordance with the mandatory European standard BS EN12566-3, 
and meets all current legislation. 
WPL Diamond is also LABC registered.

Thank you for choosing the WPL Limited Diamond  

domestic wastewater treatment system.

2

Содержание Diamond DMC

Страница 1: ...m Consent holders and or treatment plant users are responsible for correctly operating and maintaining their plant as per the manufacturer s instructions Operation Maintenance Manual inc User Guide Di...

Страница 2: ...rom the sewage treatment plant is safely disposed of in an appropriate or controlled manner at the recommended intervals De sludging MUST be carried out by an approved tankering company and WPL recomm...

Страница 3: ...page 10 3 2 1 Weekly 3 2 2 Quarterly 3 2 3 Six Monthly 3 3 Air Blower Information page 11 3 3 1 For DMS DMS EPC Models 3 3 2 For DMC Models 3 4 De sludging page 11 3 4 1 De sludging Frequency 3 4 2 D...

Страница 4: ...seek the advice of a specialist SURFACE RUN OFF STORMWATER The Diamond plant should never be connected to guttering and drainage collecting stormwater and or surface water run off from hard standings...

Страница 5: ...with the Diamond aCheck the access lid is properly and securely fastened at all times aMake sure the electrical supply is maintained at all times aRegularly check to make sure the air blower is opera...

Страница 6: ...ed to the brands and amounts you use aSpreading your laundry throughout the week and overnight aSticking to the same washing dishwasher and other cleaning products as the organisms will work more effi...

Страница 7: ...s that you have a specialist biological sewage treatment system is to put up notices in your kitchen and bathroom s You might like to copy this suggested wording WARNING This toilet is not connected t...

Страница 8: ...a disc plate diffuser and as the diffused air rises in the draft tube it causes an upward flow of process fluid This draws the settled solids from the bottom of the clarifier up through the draft tube...

Страница 9: ...The diagram opposite shows the exploded section for Diamond DMS EPC models 2 HOW THE DIAMOND WORKS continued 2 4 Schematic diagram 9...

Страница 10: ...og book for details by a British Water Accredited Qualified Service Engineer More frequent inspections may be required if mandated by local or stated regulatory authorities or if the Diamond is used o...

Страница 11: ...shall not be more than 200mbar t Ambient air temperature should not exceed 38 C 10 The maintenance programme 3 5 years is as follows t From 36 42 months Replace filter and diaphragm kit t From 48 54 m...

Страница 12: ...k the percentage of settled sludge i e sludge volume to the clear liquor The optimum level of solid settlement is normally between 5 50 Whenever the sludge volume reaches 70 the plant should be de slu...

Страница 13: ...o black Slight to strong septic odour Effluent quality is poor and is grey Air blower is running and good turbulence is evident 8 Heavy hydraulic surge flows from laundry or kitchen activities 8 For c...

Страница 14: ...DO with a metre If DO is less than 1 0 part per million contact WPL for assistance 10 Effluent sample contains brown suspended solids more noticeable during peak flow periods 19 Heavy build up of mixe...

Страница 15: ...o repairing exchanging or replacing any component part or parts that in their judgement show evidence of defects within the warranty period If you have a defective part please contact your maintenance...

Страница 16: ...s product development and the information contained in this booklet may be subject to change without notice Version LLJAN15 WPL Ltd reserve the right to change specifications in line with company poli...

Отзывы: