Workrite Ergonomics Sequoia SQ-211 Скачать руководство пользователя страница 4

Assemble Desk Mount

1

Install the Extension Pole (A) into 

the threads in the mount and tighten 

securely.

Insert 2 Set Screws (G) into the rear 

of the base and tighten securely with 

the 2.5mm Hex Wrench (I)

2

b

b

a

a

Attach Extension Pole, Cable Manager & Collar

C-Clamp Mount:

Note: If you have easy access you can assemble the clamp 

before placing it onto the work surface and tightening it 

down.

Place the Clamp Base (T) over the rear edge of the 

workstation. Attach the Clamp Bracket to the Clamp Base 

with 4 M6 × 10mm Alan Cap Bolts (V) and tighten with 

6mm Hex Wrench (S)

Grommet Mount:

Note: A grommet hole or small drilled hole from 3/8” 

diameter to a grommet hole up to 2.5” diameter is required 

to mount the grommet mount.

Place the Grommet Mount Base (U) over the grommet hole 

or drilled hole in the worksurface. From the bottom place 

the bolt (X) through the Grommet Clamp Plate (W) and 

tighten securely with the 6mm Hex Wrench (S)

Install Cable Manager (B) onto the 

Extension Pole and slide down to the 

bottom. Place Collar (C) onto the 

pole about 6” up from the bottom 

and install Set Screw (G) and tighten 

securely.

V

S

S

U

W

X

T

G

G

A

B

I

C

G

Содержание Sequoia SQ-211

Страница 1: ...Workrite Sequoia Assembly Instructions for Model SQ 211 1500201 Rev A...

Страница 2: ...Mount Qty 1 U Grommet Mount Qty 1 G M5 4mm Set Screw for Desk Mount Qty 3 V M6 10mm Alan Cap Bolt Qty 2 WM8 65mm Grommet Bolt Qty 1 I 2 5mm Hex Wrench Qty 1 S 6mm Hex Wrench Qty 1 S 6mm Hex Wrench Qty...

Страница 3: ...1 monitor Hardware Packs G M5 4mm Set Screw for Collar Qty 3 H M4 8mm VESA Mount Screws Qty 4 I 2 5 mm Hex Wrench Qty 1 Verify that you have all the hardware and tools needed for the assembly Check yo...

Страница 4: ...Clamp Bracket to the Clamp Base with 4 M6 10mm Alan Cap Bolts V and tighten with 6mm Hex Wrench S Grommet Mount Note A grommet hole or small drilled hole from 3 8 diameter to a grommet hole up to 2 5...

Страница 5: ...Always use the shortest screws possible to avoid damage to the monitor Note At this time you can chose to install the monitors in landscape or portrait orientation Before mounting be sure to measure...

Страница 6: ...he threads on the Pole Coupler and tighten securely Insert 2 Set Screws G into the Coupler Tighten securely with the 2 5mm Hex Wrench I a Attach Center Monitor to Capped Pole 6 Place Center VESA Mount...

Страница 7: ...the Monitor Mount Use the 2 5mm Hex Wrench I clockwise to increase lift counter clockwise to decrease lift Check the monitor and adjust again as necessary a Vertical adjustments is made by using the...

Страница 8: ......

Отзывы: