Workrite Sequoia
Assembly Instructions for
Model SQ-211
#1500201 - Rev A
Страница 1: ...Workrite Sequoia Assembly Instructions for Model SQ 211 1500201 Rev A...
Страница 2: ...Mount Qty 1 U Grommet Mount Qty 1 G M5 4mm Set Screw for Desk Mount Qty 3 V M6 10mm Alan Cap Bolt Qty 2 WM8 65mm Grommet Bolt Qty 1 I 2 5mm Hex Wrench Qty 1 S 6mm Hex Wrench Qty 1 S 6mm Hex Wrench Qty...
Страница 3: ...1 monitor Hardware Packs G M5 4mm Set Screw for Collar Qty 3 H M4 8mm VESA Mount Screws Qty 4 I 2 5 mm Hex Wrench Qty 1 Verify that you have all the hardware and tools needed for the assembly Check yo...
Страница 4: ...Clamp Bracket to the Clamp Base with 4 M6 10mm Alan Cap Bolts V and tighten with 6mm Hex Wrench S Grommet Mount Note A grommet hole or small drilled hole from 3 8 diameter to a grommet hole up to 2 5...
Страница 5: ...Always use the shortest screws possible to avoid damage to the monitor Note At this time you can chose to install the monitors in landscape or portrait orientation Before mounting be sure to measure...
Страница 6: ...he threads on the Pole Coupler and tighten securely Insert 2 Set Screws G into the Coupler Tighten securely with the 2 5mm Hex Wrench I a Attach Center Monitor to Capped Pole 6 Place Center VESA Mount...
Страница 7: ...the Monitor Mount Use the 2 5mm Hex Wrench I clockwise to increase lift counter clockwise to decrease lift Check the monitor and adjust again as necessary a Vertical adjustments is made by using the...
Страница 8: ......