8 of 10 Workrite Ergonomics | 800.959.9675 www.workriteergo.com
Route the left leg cable around the left cable spool to take
up extra length and plug it into the power supply.
Carefully lift and turn table over into use position.
Route the switch cable around the nearest cable spool to
take up extra cable length and plug it into the power supply.
Route the right leg cable around the right cable spool to
take up extra length and plug it into the power supply.
Lift and carry to move the table into the location it is
to be used. Plug the table into a 120 V outlet. The
Sentinel table will take a few seconds to self-initialize.
You will hear a few beeps and the table will be ready
to operate.
Plug the DMP240 power supply power cord (D) into the
power supply.
Place P-loops (P) on the switch and leg cables to secure
them under the top as shown and drill ½" deep pilot holes for
each P-loop with a
3
⁄
32
" drill bit.
Install one (1) #8 × ⅝" Phillips pan head screw (M) into each
P-loop and tighten securely.
CONNECT LEG CABLES, SWITCH CABLE AND POWER CORD TO
POWER SUPPLY & SECURE CABLES TO TOP WITH P-LOOPS
TURN TABLE OVER & POWER UP
7.1
8.1
7.3
7.2
8.2
7.4
7.5
7.6
7
8
7.5
7.4
7.2
7.3
7.6
7.6
7.1
D
M
#8 × ⅝" Phillips Pan
Head Screw
8.2
P
M
P
M
C
C