background image

Workrite Ergonomics  |  800.959.9675  www.workriteergo.com 

9 of 10

Put Workcenter Upright and Connect Power Cord to the Power Supply

Turn the workcenter over into an upright position.
Plug the Power Cord (L) into the power outlet.

Initialize Legs

After all legs and the switch are connected, and the power cord has been plugged in, hold the 

down arrow on 

the switch until the legs make a short motion down and then back up. This initializes and synchronizes the 

workcenter legs.

Adjust Feet Glides

If necessary, adjust leveling glides on the feet to level the worksurface. Unscrew to increase height, screw in to 

decrease height.

You must complete this 

initialization step or your 

workcenter will NOT 

function properly.

Cleaning instructions

To clean the Essentia legs, apply cleaner to a soft cloth. 
Suggested cleaners: Windex or Formula 409. 

Do not use solvents and do not saturate or spray cleaners directly onto workcenter base.

Hold down the down arrow 

until workcenter moves 

slightly upwards!

Parts & Accessories

Visit 

http://workriteergo.com/documentation/other/workrite_ergonomics_pricing_specification_guide.pdf

 for 

replacement parts.

10

L

a

b

11

12

b

a

Содержание Essentia ES2E30-48

Страница 1: ...y 1 I Cable Spool Qty 2 J 3 16 White Leg Cable Loops Qty 10 A Legs Qty 2 B Short Bracket Qty 4 HControl Box Qty 1 C Left End Bracket Qty 1 D Right End Bracket Qty 1 E M6 12 mm Flat Head Cap Screw Qty...

Страница 2: ...reduce the risk of electric shock always unplug this Essentia Workcenter from the electrical outlet before cleaning WARNING To reduce the risk of burns fire electric shock or injury to persons 1 Unplu...

Страница 3: ...Allen Wrench F Attach Left End Bracket C to sides of the other Leg A with Flat Head Cap Screws E using 4 mm Allen Wrench F Tighten securely Note The right bracket will be on your left and vice versa...

Страница 4: ...holes in worksurface Attach at the four corner locations using 12 Pan Head Laminate Top Screws G If you use an electric screwdriver be sure it is on the lowest torque setting to avoid stripping the h...

Страница 5: ...corner locations using 12 Pan Head Laminate Top Screws G If you use an electric screwdriver be sure it is on the lowest torque setting to avoid stripping the holes in the top With frame set positioned...

Страница 6: ...pilot holes where marked Do not drill all the way through worksurface With Control Box H positioned over pilot holes attach with two 12 Pan Head Screws G Attach Cable Spool I with the 12 Pan Head Scre...

Страница 7: ...tch and the control box Attach White Leg Cable Loops J to underside of worksurface using 12 Pan Head Laminate Top Screw G as needed for your model Attach Switch Refer to switch instructions for steps...

Страница 8: ...ct the Leg Cable A to the six position leg ports M1 M2 on the Control Box H Insert the Switch Cable into the switch port HS on the Control Box H Insert the Power Cord L into the power port on the Cont...

Страница 9: ...djust Feet Glides If necessary adjust leveling glides on the feet to level the worksurface Unscrew to increase height screw in to decrease height You must complete this initialization step or your wor...

Страница 10: ...10 of 10 Workrite Ergonomics 800 959 9675 www workriteergo com 1500240 Rev D...

Отзывы: