![Worcester Greenstore 11 Скачать руководство пользователя страница 45](http://html1.mh-extra.com/html/worcester/greenstore-11/greenstore-11_instruction-manual_996564045.webp)
45
Commissioning report
Pressure test of collector carried out
.....................................................................................................
Checks on fl uid concentrations carried out (collector hose)
.....................................................................................................
System pressure levels checked
.....................................................................................................
Functional test carried out
.....................................................................................................
Ensure that primary circuit has been correctly fl ushed
.....................................................................................................
Menu settings 1.1, 1.4, 5.2 and 5.13. carried out
.....................................................................................................
Heat curve 1.1 and 1.2 set to:
.....................................................................................................
Electricity reading on the house taken
.....................................................................................................
The instructions about how to use the heat pump have been given
to the client / to the user
.....................................................................................................
Documentation about the heat pump has been handed over
.....................................................................................................
Date and signature of the installer: