background image

USER INSTRUCTIONS & CUSTOMER CARE GUIDE

U

S

IN

G Y

O

U

R

APPL

IA

N

C

E

8-716-106-257a (08.05)

CONTROLS

7

CONTROLS

A Temperature control 

(behind front top panel)

B Reset button - burner lock-out

 

indicator/reset

button 

(on burner control box, under top panel)

C Reset button - flue overheat thermostat

 (behind

front panel)

D Reset button - boiler overheat thermostat

 (behind

front panel)

E Front panel
F Top panel
G Front top panel

A

F

G

E

C

D

B

Содержание Greenstar Danesmoor 18kW

Страница 1: ...25kW FLOOR STANDING OIL FIRED CONDENSING BOILER CONVENTIONAL FLUE ROOM SEALED FLUE FOR FULLY PUMPED OPEN VENT OR SEALED CENTRAL HEATING SYSTEMS AND DOMESTIC HOT WATER CYLINDERS THE APPLIANCE IS FOR U...

Страница 2: ...WORCESTER BOSCH TEL FAX Service call centres UK 08547 256206 757536 SCOTLAND ONLY 01506 441687 EIRE 01494 0099 Other enquiries MAIN RECEPTION 01905 754624 754619 TECHNICAL 08705 266241 SPARES 01905 7...

Страница 3: ...AS STANDARD 3 GENERAL INFORMATION 4 6 USING YOUR APPLIANCE CONTROLS 7 OPERATING THE APPLIANCE Switching the boiler on off 8 Setting the heating temperature 8 Controlling central heating 8 Frost prote...

Страница 4: ...out by a competent engineer in accordance with the relevant Installation Regulations Flue systems must not be modified in any way other than as described in the fitting instructions Any misuse or unau...

Страница 5: ...uality and proven reliability The condensing range in particular is extremely energy efficient converting more of the fuel consumed into heat offering you economical running costs and value for money...

Страница 6: ...alidate the appliance guarantee Sealed heating systems Where the appliance is fitted to a sealed heating system your installer will inform you of the minimum and maximum pressure which must be indicat...

Страница 7: ...ust not be restricted or contaminated The appliance clearances must meet the minimum shown opposite for servicing and venting purposes If this clearance is less than 75mm the flue knock out panel sect...

Страница 8: ...ate with a protected area such as a hall stairway landing corridor lobby shaft etc Air vents must allow access for clean free air and must be sited to comply with the flue terminal position requiremen...

Страница 9: ...rature control behind front top panel B Reset button burner lock out indicator reset button on burner control box under top panel C Reset button flue overheat thermostat behind front panel D Reset but...

Страница 10: ...left unused and exposed to freezing conditions shut off all the mains supplies isolate the boiler and drain the system and boiler SETTING TEMPERATURE Turn the control clockwise to increase the water...

Страница 11: ...E APPLIANCE 8 716 106 257a 08 05 OPERATING THE APPLIANCE 9 FROST PROTECTION Use a suitable anti freeze inhibitor at the correct strength to protect against freezing A frost thermostat should be fitted...

Страница 12: ...b Lockout indicator OFF boiler not on no heating hot water 1 Ensure there is a power supply to the boiler 2 Check the programmer is set to on for heating 3 Press the reset buttons C D 4 If the boiler...

Страница 13: ...loss from a property is through the roof Replace any old insulation with new insulation preferably to a minimum thickness of 200mm Window frames Single glazed windows particularly those with steel fra...

Страница 14: ...to drape over the radiator or shelves are fitted above it The positioning of furniture and tables in front of the radiator should also be avoided It is advisable to manually adjust all radiator valves...

Страница 15: ...sure it continues to operate at peak efficiency and performance it is essential that servicing and maintenance checks are performed at least once a year by a competent person beyond the initial guaran...

Страница 16: ...se temperature control setting Air trapped in heating system Bleed radiators and recharge heating system Desired room temperature exceeded by large amount Radiators are too hot Turn down thermostatic...

Страница 17: ...lied by BBT Themotechnology UK Ltd Note NO APPLIANCE FAULT IS FOUND ON OVER 30 OF ALL SERVICE CALL OUTS Please read this guide carefully to gain a good understanding of the operation of your appliance...

Страница 18: ...missioned and where appropriate that the 12 month service inspection has been carried out to the satisfaction of BBT Thermotechnology UK Ltd when requested The guarantee card must then be returned wit...

Страница 19: ...in 30 days of purchase Returning the card will register you as the owner of your new appliance and will assist us in maintaining an effective and efficient customer service by establishing a reference...

Страница 20: ...ONS CUSTOMER CARE GUIDE Part Number Worcester Bosch Group Cotswold Way Warndon Worcester WR4 9SW Worcester Bosch Group is a trading name of BBT Thermotechnology UK Ltd www worcester bosch co uk 8 716...

Отзывы: