BOILER LOCATION & CLEARANCES
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR Ri
8 716 115 168a (06/2008)
11
P
R
E -
INS
T
A
L
L
A
T
IO
N
BATHROOMS:
The boiler must be installed outside the shaded
areas shown opposite.
Additional RCD (Residual Current Device) pro-
tection may be required.
Refer to the latest IEE wiring regulations.
(See Technical Data for IP ratings.)
BOILER LOCATION &
CLEARANCES
1
1
2
2
1
1
2
2