Preparatory work

7

Greenstar – 6721852556 (2022/11)

4

Preparatory work

4.1

Observe general notices

▶ Remove the packaging, observing all notices in the packaging.
▶ Mount the HIU as close as possible to the most frequently used water 

draw-off point. 

▶ When assembling the pipework, secure the connections at the HIU to 

prevent twisting.

Other components required 

NOTICE

Push by due to excessively high differential pressure

The maximum differential pressure in the primary circuit of heat 
interface units with integrated differential pressure control valve is 
400 kPa (4000 mbar), and 80 kPa (800 mbar) without integrated 
differential pressure control valve.

▶ Where necessary, install a suitable control to limit the differential 

pressure.

▶ Protect the primary heating circuit with an expansion vessel and 

pressure-relief valve in accordance with BS EN 12828. 

As the heat interface unit is not always accessible, we recommend using 
a central automatic air separator or a deaerator in the primary circuit. 

▶ Install drain valves at all the low points in the system.
▶ Install air vents at all the highest points in the system.
▶ Install thermostatic radiator valves in accordance with CIBSE CP1.

DHW - water quality

▶ Comply with limits in the following table. 
▶ Comply with UK Water Regulations. 

CAUTION

Failure of the station due to calcification of heat exchanger.

▶ If the water hardness is 20°°dH or more, install a water softener unit.

To minimise calcification of the heat exchanger, we recommend you 
install a water softener unit if the water hardness is 

14°°dH

 or more. 

Table 4 Suitability of the water supply

Heating water quality

Water treatment and quality for both the primary heat network and 
tertiary heating circuit should comply with the water treatment guidance 
contained within CIBSE CP1.Additionally, the below additives are 
suitable for use with this product.

Table 5 Typical additives for the heating water

Floor heating

To protect the underfloor circuit in the event of faults:
▶ Mount thermal protection valve.

-or-

▶ Temperature switch on the flow pipe to the underfloor circuit 
▶ Set the switching point of the temperature switch (minimum 

temperature setpoint of underfloor heating c 10 K).

4.2

Pipework installation

Any plastic pipe-work used on the central heating system must have a 
polymeric oxygen barrier coating. 

▶ Carry out a pipe network calculation to determine the pipework sizes. 

Observe specified pressure losses of the HIU. 

▶ Fit pipework and connections without stress. 
▶ Sufficiently insulate all pipework leading to the HIU (according to 

CIBSE CP1 guidance). 

Showers/bidets

• Ensure that the shower is suitable for use with mains water pressure.
• If a shower head can be immersed in water or comes closer than 

25mm from the top edge of a bath or shower tray spill over level then 
an anti-siphon device must be fitted to the shower hose.

• Bidets with direct hot and cold mains water can be used (with the 

approval of the local water authority) and must be the over rim 
flushing type with shrouded outlets to prevent the fitting of hand held 
sprays.

Water pressure 

▶ Observe water pressure limits (

 specifications).

NOTICE

Risk of damage to household appliances!

Non-return, back flow prevention devices (including those associated 
with water meters) fitted to the mains water supply can cause a pressure 
build up which could damage the appliance and other household 
appliances.

▶ Fit a mini expansion between the non-return valve, back flow 

prevention device.

4.3

Installing the discharge pipe

CAUTION

Risk of scalding due to incorrectly installed discharge pipe!

▶ Mount discharge pipe so it cannot pose a danger when discharging 

into a drain or tundish.

When the tundish is installed indoors it should have an odour trap. If the 
temperatures in the primary circuit are higher than 85°C, we recommend 
using a Hotun-Hiflun tundish. 

▶ Install discharge pipe from the safety valve [1,3] in a pipe that is 

suitable for the maximum operating temperature. Discharge into a 
suitable drain or tundish internally. For external discharge, install as 
set out in the figure. 

▶ Install a partial elbow on the end to prevent freezing. 

Unit

Value

Water hardness

°dH 

< 20

pH value

6.0 - 9.5

Conductivity

S/cm

10 - 2790

Sulphate

mg/l

< 250

Chloride

mg/l

< 80

BASF Glythermin NF (20-62%)

Sentinel X100 (1-2%)

Fernox F1

Sentinel X200

Fernox F1 express

Sentinel X400

Fernox Alphi-11

Tyfocop Tyfocor L (25-80%)

Hoechst Antifrogen N (25-40%)

MC1+ Protector

Hoechst Antifrogen N+L (40%)

MC3+ Cleaner

Nalco Nalco (1-2%)

MC2 Silencer

Nalco Varidos 1+1 (1-2%)

MC ZERO (25-40%)

Nalco Varidos FSK (22-55%)

Содержание 7735600658

Страница 1: ...6721852556 2022 11 GB Installation and maintenance instructions for specialists Heat Interface Unit Greenstar HIU HIU E HIU KE Draft 24 11 22...

Страница 2: ...mples wiring the control unit 11 6 4 Cable preparations 12 6 5 Connecting and securing the cable 12 7 Commissioning 13 7 1 Filling flushing and venting the system 13 7 2 Adjusting the control unit 14...

Страница 3: ...erating correctly HHealth and safety The appliance contains no asbestos and no substances have been used in the construction process that contravene the COSHH Regulations Control of Substances Hazardo...

Страница 4: ...ircuit primary side 7 Heating circuit plate heat exchanger brazed stainless steel 8 Differential pressure control valve do not change adjusting screw optional 9 Flow temperature sensor NTC for heating...

Страница 5: ...this case the quantity of heat is not recorded by the heat meter accessory 12 If the bypass valve is installed the electronic bypass function must not be selected in the room controller and the jumpe...

Страница 6: ...tipulated by attaching these markings The complete text of the Declaration of Conformity is available on the Internet worcester bosch co uk 3 Regulations Observeupdatedregulationsorsupplements Thesere...

Страница 7: ...underfloor heating circuit 10 K 4 2 Pipework installation Any plastic pipe work used on the central heating system must have a polymeric oxygen barrier coating Carryoutapipenetworkcalculationtodeterm...

Страница 8: ...ust be filled using a WRAS approved filling loop See the following figure Make sure the heating system is treated using a suitable inhibitor Appendix Specifications Mount filling loop between the pipe...

Страница 9: ...vice The following hole patterns are printed on both sides of the drilling template Installation on finished wall wall mounting bracket at top mounting plate at bottom Installation on unfinished wall...

Страница 10: ...hing live electrical parts can cause an electric shock Before installing accessories Disconnect the power supply to the heat generator building management system and any other BUS systems all poles an...

Страница 11: ...t accessories to the control unit Connection Function Cables wires Heating pump only with HIU with integrated pump Phase 63 brown PEN conductor N blue Earthing green yellow Turbine DHW flow rate Red 4...

Страница 12: ...hen stripping the cables that copper strands do not fall into the module Strip the cable so that the earth conductor is longer than the other wires Fig 25 Cable preparations here power cable 6 5 Conne...

Страница 13: ...circuit pump if required 4 Adjust the room control for the heat interface unit and the heating circuit if room control is installed 5 Fill out the commissioning checklist 7 1 Filling flushing and ven...

Страница 14: ...ult of pressure fluctuations as well as solution and degassing processes After 1 2 weeks vent the system again and top up if required Vent at every highest point in the system 7 2 Adjusting the contro...

Страница 15: ...ngs Momentary presses of the selection button will cycle through the available pump curves After 10 seconds of inactivity the selected setting will be activated To change the setting press and hold th...

Страница 16: ...ently measured data Transmission frequencies 434 MHz transmission power EN 300 220 2V3 2 1 10mWe r p 868MHz transmissionpower EN300 220 2 V3 2 1 25mW e r p Encrypted protocol Real Data Radio or Open M...

Страница 17: ...ut 2 Cumulative value pulse input 2 Value of pulse L P 4 3 Pulse output 1 Value of pulse L P 4 4 Pulse output 2 Value of pulse L P Window 1 Window 2 Window 3 Window 4 6 1 LOG Date 1 Energy Max flow ra...

Страница 18: ...in countries where waste electrical and electronic equipment regulations apply e g UK Waste Electrical and Electronic Equipment Regulations 2013 as amended These regulations define the framework for t...

Страница 19: ...tion maintenance 1 2 3 4 5 6 Date Average return temperature on primary side __________ C __________ C __________ C __________ C __________ C __________ C Secondary heating T __________ C __________ C...

Страница 20: ...interface unit Open the air vents at the top of the desired circuit Close the air vents again after draining Turn the drain valve 1 anti clockwise to open 2 Fig 39 Drain point connection To drain the...

Страница 21: ...42 Heating system circulation pump NTC WW sensor and thermal overload protection accessory Drain DHW circuit completely To replace the sensor unplug the connecting lead from the sensor 1 Remove the r...

Страница 22: ...w 1 on the holder Ease forward and then lift up the expansion vessel 2 out of the connector and foam insulation Fig 46 Expansion vessel removal Flow turbine flow limiter Drain DHW circuit completely U...

Страница 23: ...n reliefs 11 Troubleshooting 11 1 Central Heating trouble shooting guide 6720808926 36 1Wo 1 5 4 3 7 6 2 3 8 2 6720808926 37 1Wo 1 2 3 4 5 6 6 6 6720808926 53 1Wo Problem Possible cause Possibly solut...

Страница 24: ...ustanyinstalledflowregulatingvalvesattheheatinterfaceunittoobtainthecorrect differential pressure Increase the supply differential pressure on the system CentralHeatingflow temperature too high HIU co...

Страница 25: ...f necessary Electronic keep warm function Adjust by pass valve Replace if necessary Faulty DHW control valve or dirt insidevalvebodycausinglowflowor no flow though district supply circuit Check that c...

Страница 26: ...sor error Bypass DHW and DHW circulation pump functions are disabled Red PWM signal indicates a DHW control valve fault By pass DHW and circulation pump functions are disabled Yellow Supply return tem...

Страница 27: ...lyze the distribution of our products and to provide individualized information and offers related to the product art 6 1 sentence 1 f GDPR UK GDPR To provide services such as sales and marketing serv...

Страница 28: ...onsumption W 3 1 Appliance protection rating IP X4D Primary circuit 65 C1 1 DHW temperature 40 C with 30 K increase 70 C2 2 DHW temperature 45 C with 35 K increase 80 C3 3 DHW temperature 50 C with 40...

Страница 29: ...y 11 Flow temperature sensor NTC primary circuit 12 Circulating pump 13 Flow temperature sensor NTC heating circuit 14 Heating control valve 15 DHW control valve 16 Return temperature sensor NTC heati...

Страница 30: ...0 3 0 2 9 2 8 2 7 2 6 2 5 2 4 2 3 2 2 2 1 2 0 1 9 1 8 1 7 2 8 3 3 3 4 2 7 2 5 2 4 2 2 2 1 2 0 1 9 1 8 1 7 1 6 1 5 00100 001 34535 Kv 1 7 m hr Kv 1 3 m hr Kv 1 3 m hr Kv 1 1 m hr l s l h 200 225 250 30...

Страница 31: ...100 150 200 70 60 50 40 30 20 15 8 9 10 7 6 5 4 3 2 1 5 0 7 0 8 0 9 1 0 6 0 5 90 80 70 60 50 40 30 20 15 10 9 8 7 6 5 4 3 2 1 5 1 0 9 0 8 0 7 0 6 0 5 100 90 80 70 60 50 40 30 20 15 10 9 8 7 6 5 4 3 2...

Страница 32: ...Kingdom Tel 0330 123 9559 worcester bosch co uk TECHNICAL SUPPORT 0330 123 3366 RENEWABLE SUPPORT 0330 123 9229 CONTROLS AND CONNECTIVITY TEAM 0330 123 3641 APPOINTMENTS 0330 123 9339 SPARES 0330 123...

Отзывы: