COMMISSIONING
Greenstar i System Compact - 6 720 807 726 (2013/05)
36
5.7.2
SECURING THE CONTROL PANEL
4. Raise the control panel.
5. Push the control panel up to engage the top edge under the case.
6. Lift the catches with your fingers.
7. Press the bottom of the control panel back to engage with the catches
8. Secure the catch retaining screws underneath the boiler.
5.7.3
FITTING THE FASCIA FLAP
1. Rotate the hinge to be in-line with the flap and present the flap
assembly up to the fascia.
2. Push the pegs on the hinge into the three slots in the front of the fascia
and close the flap.
3. Secure the flap to the fascia with the two screws provided.
Fig. 65 Installing the fascia flap
5.7.4
INSTALLING THE BOTTOM PANEL
1. The bottom panel slides onto two ledges either side of the boiler
frame.
2. Hold the panel up against the underside of the boiler and slide
towards the rear, until there is no more movement.
3. Slide the panel forward until it is fully engaged.
Fig. 66 Bottom panel installation
5.7.5
HANDOVER
▶ Complete the Benchmark Gas Boiler Commissioning Checklist.
▶ Open the fascia flap by hinging the flap downwards using the curved
hand hold in the centre of the flap.
▶ Set up the controls and show the customer how to operate all the
controls shown in the User Guide plus any external controls.
▶ Instruct the customer on:
– the need to re-pressurise the boiler occasionally and the pressure
expected at the pressure gauge.
– location of the filling loop and system pressure gauge.
– the use of the filling loop and how to re-pressurise the system.
– how to use the TRVs.
– how to reset the boiler.
▶ Show the customer the fault finding information in the User guide.
▶ Show the customer where the serial number/boiler information is
when they call in with a problem (Benchmark checklist at the rear of
the manual).
▶ Give the customer details of how to contact the installer/gas
emergency numbers.
▶ Show the customer how to safely isolate the boiler
▶ Advise the customer where they can find information on the
Worcester Bosch website.
▶ Advise the customer that the varying external temperatures will affect
the output of the boiler.
▶ Ensure that the User Guide and Installation, Commissioning and
Service manual, with the Benchmark checklist and service record, is
left with the boiler or homeowner.
▶ If the appliance is unused and exposed to freezing conditions, shut off
all the mains supplies and drain the system and boiler, label
accordingly.
5.7.6
BOILER GUARANTEE
This boiler has a guarantee against faulty materials or workmanship for a
period of two years from the date of installation subject to the following
terms and conditions:
• During the period of this guarantee any components of the boiler
which are proven to be faulty or defective in manufacture will be
exchanged or repaired free of charge by Bosch Thermotechnology
Ltd.
• The householder may be asked to prove the date of installation, that
the boiler was correctly commissioned and, where appropriate, the
first year's service has been carried out to the satisfaction of Bosch
Thermotechnology Ltd., when requested. These should be
documented as a part of the Benchmark Checklist.
• The boiler has been used only for the normal domestic purposes for
which it was designed.
This guarantee does not affect your statutory rights.
GUARANTEE REGISTRATION
Your Greenstar boiler carries a two year guarantee against faulty
material or manufacture subject to Terms and Conditions.
To read the full Terms & Conditions please visit us
on-line at www.worcester-bosch.co.uk/guarantee.
The Guarantee Registration form is available on this same page and can
be completed and submitted electronically.
Alternatively please telephone one of our Guarantee Registration
advisors on 0844 892 2552.
Your statutory rights are not affected by the manufacturer’s guarantee.
6720646608-103.1W
o
1.
3.
2.
6720646608-21.1W
o
2.
The Benchmark Checklist can be found at the rear of
these instructions.