45 | UM-PP-EN-03
6.3.2
Adjust Leveling Feet
After positioning the device at the installation site, adjust the horizontal height using a level. The
height of the 4 leveling feet can be adjusted.
Fig. 21 Adjusting leveling feet
1.
Loosen the counter nut with a
¾” (
19 mm) open-end wrench.
2.
Turn the foot up or down until the desired height has been reached
3.
Retighten the counter nut
When making leveling adjustments, it is important to ensure that the frame of the treadmill does not
twist. Lift the frame of the treadmill to check for approximately equal weight load.
The treadmill frame can deform slightly during transportation. This can be seen on an even and level
surface if the treadmill rocks slightly, or when one of the leveling feet does not touch the floor
completely. In this case, the treadmill can be realigned by applying the proper pressure on the railing.
6.4
Completion of Installation
Prior to starting operation, installation is to be completed with a trial run. During the trial run, all
device functions are to be carried out and checked.
ATTENTION
Check Device
After the trial run has been carried out, all bolted connections,
couplings, and other connections are to be checked for tightness.
Содержание ST PPS 43 Med
Страница 22: ...16 UM PP EN 03 2 7 EC Declaration of Conformity Fig 1 EC Declaration of Conformity...
Страница 26: ...20 UM PP EN 03 3 5 Dimensions Fig 3 Device dimensions PPS Bari Mill 43 Fig 4 Device dimensions PPS Bari Mill 55...
Страница 27: ...21 UM PP EN 03 Fig 5 Device dimensions PPS Bari Mill 70 Fig 6 Device dimensions PPS Med 43...
Страница 114: ...108 UM PP EN 03 12 Maintenance Report DATE MAINTENANCE MEASURES FROM REMARKS...