18.Install the combustor hood and place the two bolts down through the
hood and into the baffle for alignment. You do not need to tighten the
bolts with nuts. The nuts are only needed for shipping the stove. Replace
the stainless steel deflector, if you have one.
19.Replace the top lid.
20
.
Once the repair is complete, you may fire up your stove right away,
however, we recommend that you recheck the furnace cement seal after 2-3
days of burning and add cement if necessary due to shrinkage.
We need your help!
Woodstock Soapstone Co. takes pride in
providing the highest quality products as well as the best customer
service in our industry. We welcome your suggestions and input to
help us achieve these goals. If you have any comments to improve
our products, service, and information provided in these
instructions please contact us at (800) 866-4344 or
[email protected]. Thank you.
2/11/10
7