INSTALLATION,OPERATION & MAINTENANCE
Woodson Contact Grill – WCTx
Tel: 1300 79 1954 Web: www.stoddart.com.au Email: [email protected]
Due to continuous product research and development, the information contained herein is subject to change without notice
Page 10
Setting Up
Handling
Use suitable means to move the appliance: eg. A lift truck or fork pallet trucks (the forks should
reach more than halfway beneath the appliance).
Site Preparation
Ensure the site is level and properly cleaned.
The toaster is to be placed on a suitable bench or worktop, at a comfortable working height. (850mm –
900mm)
Ensure the press toaster is placed on a level, stable work surface, away from other heat, water or grease
emitting devices.
Allow an air gap between the machine and other objects or surfaces. We recommend a minimum gap of
100mm for normal operational use (if the machine is near any heat sensitive material we suggest you
allow additional space). Please consult national and local standards to ensure that your machine is
positioned in accordance with any existing requirement.
Unpacking
Check the machine for damage before, during and after unpacking. If machine is damaged, contact the
dealer. Should any item have physical damage, report the details to the freight company and to the agent
responsible for the despatch within seven (7) days of receipt. No claims will be accepted or processed
after this period.
Wear protective gloves to unpack the appliance from the box.
The unit is supplied fully assembled.
Remove all protective plastic film, tapes, ties and packers before installing and operating. Clean
off any glue residue left over from the protective plastic film.
Wipe all surfaces with a clean, sanitised cloth.
First Time Operation
Read the complete instruction manual before proceeding.
Plug the unit into a power source. Ensure the electrical cable is not damaged and does not hang over the
counter, and the “ON/OFF” button is set to the “OFF” position.
Your toaster is ready to use.