MRT4-DC3: #35068
Rev 6.2/2-20
8
2.4) Use the hoisting equipment to remove the lifter from the shipping container. Avoid
damaging the vacuum pads.
3B
3A
3)
3C
3D
Connect the electrical connectors (figs. 3A-B and
figs. 3C-D).
If the lifter has a notification buzzer, install the 9-
volt battery as directed in “N
4)
4A
Assemble the pad frame for optimal load support
page 9). Remove the pad covers (fig. 4A) and save them
for future use.
5) Perform tests as required under “T
ASSEMBLY
Содержание MRT410LDC3
Страница 2: ...MRT4 DC3 35068 Rev 6 2 2 20 2 ...
Страница 6: ...MRT4 DC3 35068 Rev 6 2 2 20 4 SPECIFICATIONS Note A standard MRT411LDC3 is shown ...
Страница 11: ...Rev 6 2 2 20 MRT4 DC3 35068 9 TO CHANGE THE PAD FRAME CONFIGURATION ASSEMBLY ...
Страница 44: ...MRT4 DC3 35068 Rev 6 2 2 20 42 ...
Страница 45: ...Rev 6 2 2 20 MRT4 DC3 35068 43 ...
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......