Distributor: ShadeScapes Americas TEL: 970.527.7070 www.shadescapesusa.com [email protected] © PROTRADE & WOODLINE cc. 2010
www.woodline.co.za
3|4
WOODLINE
SHELL BASE KIT
800 x 800 mm (31.5“ SQ)
ASSEMBLY INSTRUCTIONS
STEP 15
STEP 14
STEP 13
STEP 9
STEP 10
STEP 11
STEP 12
OR
COMPACT CONCRETE MIX & SCRAPE ACROSS THE
SURFACE TO ENSURE CONCRETE DOES NOT
PROTRUDE ABOVE BOTTOM OF THE BASE.
USE A DAMP CLOTH AND WIPE THE METAL RIM
AREA CLEAN.
LEAVE CONCRETE TO SET BEFORE YOU CONTINUE
TO STEP 12. (THIS SHOULD BE FOR 24-48 HOURS)
CAREFULLY TURN THE SHELL BASE OVER.
(YOU WILL REQUIRE ASSISTANCE OF AT LEAST
ONE OTHER PERSON AS THE WEIGHT IS +/- 230 lbs.
UNSCREW THE CENTER M10 BOLTS
UNSCREW THE M8 BOLTS ON THE RIM OF BASE
ATTACHE THE HANDLES USING THE M8 BOLTS AS
INDICATED IN THE DIAGRAM. ENSURE THE BOLT
ARE PROPERLY SECURED. HANDLES ARE USED FOR
LIFTING & MOVING OF SHELL BASE.
OR SCREW IN M8 SKIFFY PLUGS IN IF THE SHELL
BASE IS IN THE REQUIRED POSITION.