Woodline nemo Multifunctional Water Base Скачать руководство пользователя страница 2

2/3

1”/26mm Adapter Sleeve (2A)

1

1

/

2

”/32mm Adapter Sleeve (2B)

2”/38mm Adapter Sleeve (2C)
Pole Alignment Insert (3)
Filler Cap (4)

Carrying Indent

Carrying Indent

Water Base Body (8)

Optional Nylon Roller Kit (10)

Hand Wheel (5)

Stainless Steel Pole Stand (1)

3 x M8 washers and M8x16 bolts (6)

1) From the bottom of the water base body (8) 

slide the pole stand (1) in and up until its base sits 

flush with the water base body underside (8).

2) Insert the 3 M8 washers and bolts (6) into the 3 

holes under the pole stand triangular base and 

tighten using the supplied allen key.

3) Slide the pole alignment insert (3) from the top 

of the pole tube down inside it until it sits at the 

base of the tube.

4) Insert the required adapter sleeves (2A, 2B, 2C) 

into the top of the pole tube, aligning them until 

the notch is centred to allow the hand wheel hole 

to line up.

5) Insert the hand wheel (5) into the bolt hole on 

the side of the pole stand (1), do not tighten until 

the umbrella pole is positioned in the pole stand, 

only then should you tighten to ensure the 

umbrella pole is fixed in place.

OPTIONAL NYLON ROLLER KIT ASSEMBLY:

1) If you have purchased the option Nylon Roller 

Kit (10) it should ideally be attached to the water 

base body before you assemble the pole tube 

and the fittings. You will find it in a separate bag 

or box.

2) Turn the water base over and place the nylon 

roller and bracket into position within the 

carrying indent with the two threaded holes on 

either side. 

3) Insert the 2 x M8 washers and 2 x M8x16 bolts 

and tighten them into place.

4) The water base can now be easily repositioned 

by simply tilting it onto the roller and pushing it 

into the required place.

Nemo Water Base 10 March 2021

Отзывы: