4. INSTALLATION
4.1 INSTALLATION ZONE CHARACTERISTICS
WARNING
It is prohibited to install the machine in explosive environments.
The installation zone must be selected evaluating the work space required depending on the dimension of the pieces to
be machined, and taking into account that a free space of at least 800mm must be left around the machine. It is also
necessary to check the floor capacity and its surface, so that the machine base is evenly resting on its four supports. A
power outlet and a chip-suction system connection shall be close to the selected machine setting and it must be
conveniently lighted.
4.2 INSTALL OF LOOSE PARTS-INTRODUCTION
A few elements will be disassembled from the machine main structure due to packaging and shipping requirements.
These loose parts should be installed as follows.
WARNING
Please tighten all bolts and nuts absolutely. Otherwise, may cause machine wobble or serious injury to the operator or
other persons.
4.2.1 INSTALL TABLE
Tools required for assembly:
- Faucet spanner
- Put the table A onto the trunnion. Aline the mounting
holes which are on the bottom of table to the four holes
on trunnion.
- Use four hex bolt 1, four teeth washer 2 and four flat
washer 3 to mount the table A to trunnion.
Fig.4.2.1
4.2.2 INSTALL FRONT RAIL AND RIP
FENCE
- Put nut 2 and washer 3 on front rail 1
- Make front rail through table A, after leveling rail, lock
by other nut and washer.
- Along with rail A, slide RIP FENCE B on the table
Fig.4.2.2
-8-
1
2
3
A
1
2
3
A
B