Wood Stone Gas Plancha (GPL)
Installation and Operation Manual
PG
17
OF
34
M0202.09 JULY 2020
An ongoing program of product improvement may
require us to change specifications without notice.
WOOD STONE CORPORATION
1801 W. Bakerview Rd.
Bellingham, WA 98226 USA
TOLL FREE
800.988.8103
TEL
360.650.1111
FAX
360.650.1166
woodstone-corp.com
OPERATIONAL SEQUENCE
SEQUENCE OF OPERATION
Based upon the temperature of
each of the zones as compared to
the Set Point, individual Burners
are ON or OFF�
Green front panel lights
illuminate�
Note: On a cold unit, at initial
start-up, zones will light in
sequence, left to right, except on
5-zone
Burners light�
Controller determines temperature
is below Set Point and signals
Burners to light�
Software version blinks on one of
the green front panel lights, and
momentarily illuminates the red
“Fault” light�
Burner(s) do not light�
*
After 3 attempts, Gas Valve closes
and red Fault light illuminates�
No additional attempts at relighting until
Main Power is turned OFF, then ON to reset�
Power Switch ON�
Power OFF�
All Gas Valves close�
All Burners and Controller OFF�
*
This is true of each zone individually�
If one zone “locks out”, the other zones
could continue to run normally�
Resetting the unit is required to unlock
the locked zone�