
Sawmill Operation
Preparing The Sawmill For Towing
4
4-22
60HD-R04doc112210
Sawmill Operation
See Figure 4-12.
CAUTION!
Check to be sure the saw head safety chain is
secured before towing the sawmill. Failure to properly
secure the saw head can result in severe machine damage.
Be sure the blade housing and pulley covers are in place
and secure. Use the safety retainer pin and cable to fasten
blade housing covers.
16.
Remove all loose objects from the bed of the mill. Store the outrigger jack handle in the
bracket provided on the rear/loading-side outrigger guide.
17.
Place the board return table in the towing position on the sawmill. Reverse the setup pro-
cedure described in
. Be sure to secure the table to the frame with the retain-
ing pins.
WARNING!
Secure the board return table to the sawmill
bed before towing. Failure to do so may result in damage to
the equipment and/or serious injury.
18.
Place both fenders in the slots located behind the trailer tires and secure with rubber
straps. Raise all but the very front outrigger.
For Fine Adjust Outriggers (FAOs), be sure to adjust the outrigger base height so that the
grease fitting is just below the lowest outrigger hole before securing the FAO in position
with the lock pin.
CAUTION!
Be sure the outrigger base is adjusted properly
before securing the FAO in position with the lock pin. Fail-
ure to do so will cause damage to the outrigger grease fit-
FIG. 4-12