3
ATTACHING THE BAGS TO THE SIDE RACK WITH THE G-HOOKS
3- Thread the 1” webbing from the inside of the side rack hoop around the tube to the outside. FIG6
4- Slide the Slot on the G-Hook over the outer most webbing (Single Layer of Webbing) as shown in FIG7-8-9
FIG6 FIG7
FIG8
FIG9