background image

Installation, operating and 

maintenance instructions

High performance solar collector

TopSon F3-1 / F3-1Q / F3-Q

Roof top installation 

with 

AluPlus installation system

Single-row roof integration

3062165_201508   

Subject to technical modifications

GB

P 9

Wolf GmbH, Postfach 1380, D-84048 Mainburg, Tel. +498751/74-0, Fax +498751/741600, Internet: www.wolf-heiztechnik.de

Содержание TopSon F3-1

Страница 1: ...lector TopSon F3 1 F3 1Q F3 Q Roof top installation with AluPlus installation system Single row roof integration 3062165_201508 Subject to technical modifications GB P 9 Wolf GmbH Postfach 1380 D 8404...

Страница 2: ...of integration Slate roof 24 Roof integration M nch Nonne 31 Fitting the sensors 37 Filling the system Safety datasheet Initial start up 38 Pressure testing Venting the system 39 System operating pres...

Страница 3: ...ion rear mineral wool Thermal insulation lateral mineral wool Melamine resin foam mineral wool Connections flat packing with union nut G Angle of inclination 15 to 90 15 bis 75 15 to 90 Optical effici...

Страница 4: ...esign and implementation EN 12977 Solar heating systems and their components Bespoke systems this includes generally applicable information regarding design and implementation VDI 6002 Solar heating f...

Страница 5: ...tractor under consideration of local conditions and in compliance with the following technical rules EN 62305 Parts 1 4 Protection against lightning VDE 0100 Part 540 Selection and erection of electri...

Страница 6: ...loads of up to 2 4 kN m and pressure loads of up to 4 kN m For safety reasons the cross battens rafters and roof tiles under the roof hooks must not show signs of previous damage cracking drill holes...

Страница 7: ...75 C in external areas it must also be UV and weather resistant Only use the gaskets supplied Pipes close to the collectors may reach temperatures of up to 200 C when the system is on standby Beware o...

Страница 8: ...0 50 90 22 x 1 20 SEM 1 750 50 50 6 6 6 15 22 x 1 10 SEM 1 750 80 80 30 18 x 1 20 SEM 1 750 50 80 70 18 x 1 20 SEM 1 750 50 80 7 7 7 15 28 x 1 5 10 SEM 1 1000 80 80 15 18 x 1 20 SEM 1 1000 80 80 50 22...

Страница 9: ...l chalk 2 x screwdriver spanner SW 13 1 x wood drill approx 5 mm only roof integration 1 x angle grinder with stone cutting disc 2 x open ended spanner SW 30 1 x adjustable pliers 1 x hole saw where t...

Страница 10: ...e Fit compensators only to the short connectors For single sided pipework to the left see example diagram the short connectors are on the right For single sided pipework to the right rotate the collec...

Страница 11: ...r mounted on end 1030 mm Length of mounting rail Alu for 2 collectors mounted on end 2160 mm Length of mounting rail Alu for 3 collectors mounted on end 3290 mm Length of mounting rail joiner 100 mm C...

Страница 12: ...washer nuts Preparatory installation of roof hooks Fitting roof hooks to battens installed before Top roof hooks Bottom roof hooks M8 x 20 coach bolt M8 x 20 coach bolt M8 x 20 coach bolt M8 washer nu...

Страница 13: ...fficient numbers into the mounting rails 5 Fit the mounting rails with washer nuts onto the roof hooks 6 Cover the roof hook area with tiles C o l l e c t o r a c r o s s 1 0 6 C o l l e c t o r o n e...

Страница 14: ...rail Collector array width M8 x 20 coach bolt Where the tile valley is not above a rafter a separately available rafter compensating plate 3 is fixed above the rafter 2 and the roof hook 1 nestled in...

Страница 15: ...mounting rails with coach bolts 4 Cover the slate hooks with commercially available lead flashing 5 Cover the roof Collector array width C ollector across 1 06 C ollector on end 2 06 Option Snow load...

Страница 16: ...ed screws should be cut off flush with the nut above the mounting plate This ensures that the collector housing does not come to rest on the screws The roof skin is sealed by lightly and carefully tig...

Страница 17: ...ough the top mounting rail and initially tighten by hand into the collector 3 Fit additional collectors likewise 4 Secure the fittings for the flow and return Check gaskets 5 Tighten all screws and nu...

Страница 18: ...ION Screws nuts grub screws wood screws in the bag Intermediate panels Connecting rail Standard dimensions for determining the position of the collector array Position the collector array so that the...

Страница 19: ...6 m Mounting rail for 1 add collector 1 13 m 2 x M8 x 16 coach bolts 4 x M8 x 16 coach bolts Wooden spacers in the thickness of the battens Triangular sealing strip Top panel Collector Wooden spacers...

Страница 20: ...he wooden spacers batten thickness less 9 mm to the rafters 3 Affix the flashing tape in accordance with the diagram For this peel back the protective foil only in the area actually to be used for the...

Страница 21: ...hand 4 Drill a 5 mm hole through the mounting rail and the wooden spacers into the rafter and secure to the rafter with 8 x 80 hexagon head cap wood screw 5 Secure the flow and return fittings Check...

Страница 22: ...tor position Then bend the tabs at the top of the intermediate panels to prevent them from sliding through 2 Tighten all screws and nuts to secure the collector 3 Fully peel back the protective foil f...

Страница 23: ...h rafter a wooden spacer of batten height must be fitted below the casing panel Secure the casing panel with clamps 3 Push the protective edge profiles at the casing panel joint at the top over the re...

Страница 24: ...ray Width incl visible edging panels Min 2 7 m Min 1 m Align to the left or right Width with flashing pieces lift plates Width with flashing pieces lift plates Width incl visible edging panels Side pa...

Страница 25: ...strips of flashing tape are used these must be joined with an overlap of at least 5 cm Do not yet affix the flashing tape to the roof tiles as the collectors have yet to be secured to the mounting ra...

Страница 26: ...for now 4 Do not yet secure the upper mounting rail to the roof 5 Secure the flow and return fittings Check gaskets 6 Check for leaks in accordance with the section Leak testing Install the solar line...

Страница 27: ...panels to prevent them from sliding through 2 Tighten all screws and nuts to secure the collector 3 Fully peel back the protective foil from the flashing tape and affix the flashing tape to the tiles...

Страница 28: ...rim with scissors if necessary Ensure sufficient overlap 8 10 cm 2 Align lift plates parallel to glass retaining strip of collector at a distance of 65 mm 3 Fix the lift plates at the top with 2 nails...

Страница 29: ...imension X results by which the collector must be raised in order to fit the upper edging panel Remove upper edging again and place a suitable spacer block under the top mounting rail 5 Pre drill thro...

Страница 30: ...etainers each 2 Cover the joints in the top edging panel with the edge protector 3 Hook the side panels into the glass retaining strip of the collector using a rotating motion and slide them upwards u...

Страница 31: ...to the battens Screws nuts grub screws wood screws in the bag Intermediate panels Connecting rail Flashing tape base right Right hand skirt Left hand skirt Standard delivery Assembly components Numbe...

Страница 32: ...mmendation Stuff the space below the top panel at the tile contact point to prevent the tile from pushing through Installation and extension of the lower mounting rail Flashing tape base left Flashing...

Страница 33: ...ail 3 Position the wooden spacers batten height onto the rafters at the top of the collectors Position the mounting rail on top of the wooden spacers and push against the top of the collector Initiall...

Страница 34: ...g tape 1 Push in the intermediate panels as per diagram If this should foul during the installation correct the collector position Then bend the tabs at the top of the intermediate panels to prevent t...

Страница 35: ...re e g with a hammer Affix the tape end to the support and the highest point Mark the width of 2 tiles along the entire length of the flashing tape and trim Affix the entire tape to the support starti...

Страница 36: ...anel with clamps 3 Push the protective edge profiles at the casing panel joint at the top over the return see the diagram 4 Affix the side and top triangular sealing strip to the casing panels Install...

Страница 37: ...Air vent trap 1 collector Pipework Collector sensor 6 mm Sensor well Flow connector Pipework for roof top flat roof installation Return connector Pipework for roof integration Pipework for roof integ...

Страница 38: ...ng the system from being filled correctly Reducing the drain rate at the BDF valve can help prevent this situation Reduce the drain flow rate until the required system operating pressure is constantly...

Страница 39: ...nd safety valve remain integrated during the pressure test If the pressure test is successful first bleed the system and then discharge ANRO until the pressure is reduced to the charge pressure of the...

Страница 40: ...indication of the correct system operating pressure is an overpressure of 1 5 2 0 bar at the highest point of the system when cold The system operating pressure at the solar module is therefore 1 5 2...

Страница 41: ...led O 11 Solar circuit pressure tested incl leak check on all threaded solder and compression fittings O 12 All joints glands on shut off valves and fill drain valves leak tested O 13 System pressure...

Страница 42: ...ost installation check or initial inspection should be included as a component of the overall service package for the system and can be itemised separately in the quote if required The main system par...

Страница 43: ...es If the cylinder is included in the service contract the cylinder should be serviced in accordance with the manufacturer s instructions If the service or inspection reveal the need for additional wo...

Страница 44: ...re tested for this release pressure from expansion vessel _____bar _____bar In case of noisy pumps or system pressure fluctuations vent the system for this block the gravity brake O O System pressure...

Страница 45: ...re tested for this release pressure from expansion vessel _____bar _____bar In case of noisy pumps or system pressure fluctuations vent the system for this block the gravity brake O O System pressure...

Страница 46: ...re tested for this release pressure from expansion vessel _____bar _____bar In case of noisy pumps or system pressure fluctuations vent the system for this block the gravity brake O O System pressure...

Страница 47: ...re tested for this release pressure from expansion vessel _____bar _____bar In case of noisy pumps or system pressure fluctuations vent the system for this block the gravity brake O O System pressure...

Страница 48: ...charge pressure Safety valve has responded Check pipework for leaks Notify your specialist contractor Flow rate not correct Faulty pump Shut off valve Flow rate is dependent on temperature viscosity...

Страница 49: ...ower consumption solpump W 25 25 25 25 Standby power consumption solstandby W 5 5 5 5 Annual auxiliary electricity consumption Qaux kWh 93 8 93 8 93 8 93 8 Product fiche according to Regulation EU no...

Страница 50: ...p W 25 Standby power consumption solstandby W 5 Annual auxiliary electricity consumption Qaux kWh 93 8 Product fiche according to Regulation EU no 812 2013 Supplier s name or trade mark Wolf GmbH Supp...

Страница 51: ...51 3062165_201508 Notes...

Страница 52: ...s and EN 12975 1 specifications EN 12975 2 We Wolf GmbH Industriestra e 1 D 84048 Mainburg Germany hereby declare that the above solar collectors comply with the appropriate regulations laid down in t...

Отзывы: