
2
3064298_201507
Table of contents
Contents ............................................................................................Page
Information, layout and equipment
1. Safety information / standards and regulations .........................................................5
2. General information ...................................................................................................6
3. Information on the heat pump ................................................................................7-8
4. Standard delivery ......................................................................................................9
5. Layout .................................................................................................................10-11
6. Equipment features .................................................................................................12
7. Dimensions BWL-1S(B) ....................................................................................13-15
Siting
8. Siting information / minimum room volume .......................................................16-17
9. Siting the outdoor module .......................................................................................18
10. Siting the indoor module ........................................................................................19
11. Gravel bed and foundation diagram for the outdoor module .................................20
12. Anchoring the outdoor module and providing vibration isolation ...........................21
13. Wall mounting the outdoor module ........................................................................22
Installing the heat pump
14. Positioning the wall duct ........................................................................................23
15. Routing the refrigerant lines .................................................................................24
16. Connecting the refrigerant lines to the outdoor module .......................................25
17. Connecting the refrigerant lines of the indoor module ..........................................26
18. Filling the refrigerant lines ................................................................................27-28
19. Testing the refrigerant lines for leaks .....................................................................29
20. Connecting the heating/cooling circuit and the DHW circuit .............................30-32
21. Split heating centre with CEW-2-200.....................................................................33
Control system and power supply
22. Power supply / General information ......................................................................34
23. Connection diagram ..............................................................................................35
24. Power supply to the outdoor module .....................................................................36
25. Power supply to the indoor module ..................................................................37-45
25.1 Electric heater connection ............................................................................38
25.2 PSU / PV / Smart grid / BUS cable connection .......................................38-39
25.3 HCM-3 control PCB connection ...................................................................40
25.4 Wiring diagram for HCM-3 / AWO ...........................................................44-45