
4.10 Low Voltage Controller
Chapter 4: Removal, Replacement, and Adjustment Procedures
3. Install the mounting screws (D).
4. Tighten the screws.
5. Insert the two ground wires on the ground stud (C), and tighten the screws.
6. Connect the four wires to the high voltage side of the controller (F).
7. Install and tighten the four wire nuts (A).
8. Connect the three wires to the wires leading to the raceway.
9. Install and tighten the three wire nuts (E).
10. Remove the lockout and tagout from the building circuit breaker.
11. Set the building circuit breaker back to the ON position.
12. Perform functional check of the low voltage controller (F).
Page 4 - 24
Integris® 2001 Headwall System Service Manual (man148ra)
Содержание Integris 2001
Страница 4: ...Revisions NOTES Page iv Integris 2001 Headwall System Service Manual man148ra...
Страница 12: ...Table of Contents NOTES Page xii Integris 2001 Headwall System Service Manual man148ra...
Страница 14: ...Chapter 1 Introduction NOTES Page 1 2 Integris 2001 Headwall System Service Manual man148ra...
Страница 30: ...Chapter 2 Troubleshooting Procedures NOTES Page 2 2 Integris 2001 Headwall System Service Manual man148ra...
Страница 48: ...Chapter 3 Theory of Operation NOTES Page 3 2 Integris 2001 Headwall System Service Manual man148ra...
Страница 86: ...Warranty Chapter 5 Parts List NOTES Page 5 6 Integris 2001 Headwall System Service Manual man148ra...
Страница 145: ...Gas Outlets Universal Type Chapter 5 Parts List NOTES 5 Integris 2001 Headwall System Service Manual man148ra Page 5 65...
Страница 280: ...Chapter 6 General Procedures NOTES Page 6 2 Integris 2001 Headwall System Service Manual man148ra...
Страница 288: ...Chapter 7 Accessories NOTES Page 7 2 Integris 2001 Headwall System Service Manual man148ra...