background image

BA CH EX 260-IECEx-eng Rev2.18.01.2019  

 

Contents 

1. 

ABOUT THESE INSTRUCTIONS ................................................  3 

1.1

 

Symbols and guidance signs in these instructions ................... 3

 

1.2

 

Who are these instructions for? .................................................. 3 

 

2.

       

SAFETY………………………………………………………………….3

 

2.1

 

Operating conditions..................................................................... 3

 

2.2

 

Safety instructions ........................................................................ 4

 

 

Conformity to standards ............................................................... 4 

 

3.

       

AN OVERVIEW OF THE UNIT….…………………………………….5

 

3.1

 

Technical data ................................................................................ 5

 

3.2

 

Applications ................................................................................... 6 

 

4.       INSTALLATION…………………………………………………….      6 

4.1

 

Mounting ......................................................................................... 6

 

4.2

 

Electrical connection..................................................................... 6

 

4.3

 

Connection of the exterior equipotential bonding ..................... 6

 

4.4

 

Set up and operation ..................................................................... 7 

 

5.

 

MAINTENANCE .............................................................................. 7

 

6.

 

REPAIR / RECONDITIONING ........................................................ 7

 

7.

       

DISPOSAL……………………..….…………………………………….8 

8.

       

ACCESSORIES….……………………….………………………..       8

 

8.1

 

Mounting foot ................................................................................. 8

 

8.2

 

Junction box .................................................................................. 9

 

8.3

 

Water tank ...................................................................................... 9 

 

9.

        

SPARE PARTS………………..….…………………………………….9 

 

10.

      

EXAMINATION CERTIFICATE….…………………………………..10 

 

11.

    

  IECEx CERTIFICATE….…………………………………………….. 11 

 

12.

      

DECLARATION OF CONFORMITY…………………………..…….12

 

 

Содержание CH EX 260 M Series

Страница 1: ...OPERATING INSTRUCTIONS EX camera CH EX 260 M m ...

Страница 2: ...standards 4 3 AN OVERVIEW OF THE UNIT 5 3 1 Technical data 5 3 2 Applications 6 4 INSTALLATION 6 4 1 Mounting 6 4 2 Electrical connection 6 4 3 Connection of the exterior equipotential bonding 6 4 4 Set up and operation 7 5 MAINTENANCE 7 6 REPAIR RECONDITIONING 7 7 DISPOSAL 8 8 ACCESSORIES 8 8 1 Mounting foot 8 8 2 Junction box 9 8 3 Water tank 9 9 SPARE PARTS 9 10 EXAMINATION CERTIFICATE 10 11 IE...

Страница 3: ...erefore have a particular responsibility They require precise knowledge of the applicable rules and regulations These instructions give a brief summary of the most important safety measures They supplement the corresponding regulations that the responsible staff must study 2 Safety The following safety instructions have to be strictly followed Otherwise you put yourself and others in danger 2 1 Op...

Страница 4: ... well as the screw plugs may not be altered The camera may only be operated in an undamaged and clean condition The responsibility in respect of proper use of these plug devices with reference to the basic conditions existing in the plant lies with the operator alone 2 3 Conformity to standards The camera conforms to the following regulations and standards Directive 2014 34 EU IEC 60079 0 2017 IEC...

Страница 5: ...1 dimensional sketch of the camera Type key Explosion protection II 2 G Ex db IIC T6 Gb II 2 D Ex tb IIIC T85 C Db Ambient temperature 30 C Ta 55 C Test certificate IECEx TUN 13 0023X TÜV 10 ATEX 381435 X Housing material Stainless steel 1 4571 AISI316Ti SUS316TiTp stainless steel 1 4301 AISI304 V2a powder coated ...

Страница 6: ... Electrical connection The camera is delivered with a cable which is ready to connect The connection to the junction box see point 8 2 of these instructions is performed on site and should be carried out by suitably trained personnel 4 3 Connection of the exterior equipotential bonding An exterior equipotential bond must be made with the camera The connector is located on the rear of the camera an...

Страница 7: ...ints shall be checked during maintenance Observation of the approved temperatures according to IEC 60079 0 and the instructions on the camera type plate Cracks in the cable gland Cracks and damage to the front glass Damage to the gaskets Screw connections are properly seated 6 Repair Reconditioning Repair reconditioning work may only be undertaken using WISKA original spare parts Repairs which aff...

Страница 8: ...BA CH EX 260 IECEx eng Rev2 18 01 2019 8 Only use original WISKA accessories 8 1 Mounting foot Figure 5 mounting foot Material Stainless steel 1 4305 AISI303 SUS303 powder coated Weight 2 6kg ...

Страница 9: ...4 SUS304 powder coated Weight 8 5kg 8 3 Water tank The water tank does not have any explosion protection For this reason it must be installed outside the area which is at risk of explosion Figure 7 water tank Material Stainless steel 1 4301 AISI304 SUS304 powder coated Weight 23 kg empty 32 5 kg full 9 Spare parts Only use original WISKA accessories Please do not hesitate to contact us if you requ...

Страница 10: ...BA CH EX 260 IECEx eng Rev2 18 01 2019 10 10 Examination certificate ...

Страница 11: ...BA CH EX 260 IECEx eng Rev2 18 01 2019 11 11 IECEx certificate ...

Страница 12: ...BA CH EX 260 IECEx eng Rev2 18 01 2019 12 12 Declaration of conformity ...

Страница 13: ...BA CH EX 260 IECEx eng Rev2 18 01 2019 13 Page intentionally left blank ...

Страница 14: ...14 WISKA Hoppmann GmbH Kisdorfer Weg 28 24568 Kaltenkirchen Germany 49 0 4191 508 100 49 0 4191 508 209 sales wiska de www wiska de ...

Отзывы: