
4
4
RJ
45
Lock
M3 x 8
M3 x 8
5
RS
232
Reset
Abdeckung/
Cover
RJ
45
4
4
RJ 45 / Ethernet
2
2
2
RS
232
RS 232
2 a
OV 50A
13VDC
12VDC
5VDC
Lock
10 dB
1
1
RESET
OV 51S
New cover included
in delivery!
Fig. 1
Fig. 3
Fig. 2
Note Lock LED:
Duty cycle, if a modul is polled
Assembly
1.
Remove all connecting cables from the OV 50A.
2.
Remove the screws
(1)
and lift out the OV 50A booster
(see Fig. 1)
3.
Remove the three screws
(2)
and the nuts
(2a booster)
from the cover (see Fig. 2) and lift off the cover.
Cut out the metal plates for RJ 45 and RS 232, taking care
that no burrs remain.
Disconnect the power before starting work!
Installing the OV 51S
1.
Secure the OV 51S to the cover with two
screws
(4)
(see Fig. 3). Connect the
power supply plug (tied to the black
cable with a cable tie) to socket 5. Take
care that the plug is inserted with the
correct polarity. Built in booster.
Caution: Lay the cable with a loop
between the two modules, as
shown in Fig. 4!
2.
Fit the cover and secure it with the three
screws
(2)
. Slide the OV 50A into the
TOPLINE
HEADEND and secure it with
three screws. Connect all connecting
cables again.
Form a loop!
Power supply plug
Fig. 4