FINAL COMISSIONING
10
Allow the cistern to fill and check thoroughly for
leaks around the toilet, cistern, water inlet, flush
pipe and waste connections.
Hold the inlet valve down to cause the cistern
to internally overflow. Ensure that the overflow
can discharge the incoming water. If necessary,
reduce the incoming water flow by partially
closing the isolation valve.
Ensure the divertor is positioned to allow the
discharged water a clear unobstructed passage
into the cistern.
Check that the inlet valve shuts off on the water
line indicated inside the cistern. If adjustment
is needed, move the float up or down the
notched stem as required until the inlet shuts
off on the water line indicated.