1107200
Shadow VI User Manual
page 66
Chapter 2
Installation and Checkout
Final Checkout Sequence
DANGER
!
FAILURE TO PERFORM SAFETY SYSTEM TESTS
•
Perform the final checkout sequence below when you have completed installation of your
light curtain, before operating the equipment it is connected to.
•
Operate your machinery only after your safety system meets all the requirements of the
checkout sequence.
•
Perform the final checkout sequence whenever repair, maintenance or modification is
performed on your light curtain or the machinery it is connected to.
•
Perform the “daily test” safety system checkout sequence on page 93 (in French, en
Français, page 114) every day before operating any machinery connected to Shadow safety
light curtains.
Failure to comply with these instructions will result in death or serious injury.
DANGER
!
CHANGE IN STOPPING TIME REQUIRES SAFETY DISTANCE ADJUSTMENT
•
Repair your machinery stopping mechanism if its stopping time increases beyond the
acceptable limit.
•
Re-calculate the light curtain safety distance, using the new stopping time.
•
Adjust the location of the light curtain(s) accordingly.
•
Perform the checkout sequence before operating the equipment.
Failure to comply with these instructions will result in death or serious injury.
You have followed the installation steps in this chapter to correctly install your Shadow
safety light curtains. Now perform the checkout sequence to make sure your safety system is
working properly.
You must perform a checkout sequence after mounting and wiring are complete and before
you use Shadow safety light curtains with your machine.
It is also imperative to perform the checkout sequence every time any maintenance, repair or
other modification is performed on a Shadow safety light curtain unit or on the machinery
connected to the light curtain.
NOTICE
Use opaque test bars of 1 1/4" (32 mm) and 1/8” (3.2 mm) diameter for performing the
checkout sequence. If you are using the Floating Window option, also use a 2" diameter
test bar as instructed below.
Perform the daily test in Appendix A every day before operating the press. Follow the
checkout sequence below every time you repair, maintain or modify the press.
Содержание Shadow VI
Страница 142: ...1107200 Shadow VI User Manual page 130 Appendix C Installation of Shadow VI WPC Control Board ...
Страница 144: ...1107200 Shadow VI User Manual page 132 Appendix D Replacement Parts ...
Страница 150: ......
Страница 151: ......
Страница 152: ......
Страница 153: ......
Страница 154: ......
Страница 155: ......
Страница 156: ......
Страница 157: ......
Страница 158: ......
Страница 159: ......