9.6
Running-in of new components - general
After you have done an overhaul or you have installed new components of the piston running
system, WinGD recommends to do a running-in procedure. This makes sure a correct film of
cylinder oil on the piston running system is built. The procedure includes a temporary higher feed
rate, refer to
.
WinGD recommends an inspection of the cylinder liners and of the piston rings after 24 operation
hours and after 72 operation hours (001,
). For this running-in procedure it is not
necessary to have a special loading up apart from vessel specific loading up protocols.
Fig 9-3
Feed rate adjustments - running-in
001
001
X52
AA00-0000-00AAA-950B-A
Operation Manual
Running-in of new components - general
Winterthur Gas & Diesel Ltd.
- 344 -
Issue 002 2018-11
Содержание X52
Страница 8: ...Page left intentionally blank 8 ...
Страница 113: ...Page left intentionally blank 113 ...
Страница 275: ...7 Installation 7 1 Installation 276 275 ...
Страница 487: ...13 Schematic diagrams 13 1 Schematic diagrams general 488 13 2 List of diagrams 494 487 ...