RP1
5
0XD MK2
OPERATIONAL AND SAFETY
REQUIREMENTS
PRE-DELIVERY
1.1
Drive coupling alignments, pan and star meshing of pan rack and drive gear.
1.2
Operating clearances star blade to pan. Fixed blade to pan wall.
1.3
Correct oil level in gearboxes. All grease points charged. Gear teeth greased.
1.4
No load test. Correct rotations.
PRE INSTALLATION
2.1
Check consignment.
2.2
Offload equipment using certified lifting gear of suitable capacity, by a competent
person (see separate chart for nett weight).
INSTALLATION
3.1
Refer to contract arrangement and site instructions.
3.2
Mixer to be mounted on supports of adequate strength and rigidity to prevent undue
vibration when mixing and securely bolted.
3.3
Mixer frame to be level on structure, add packers as required.
3.4
Check that pan is correctly seated and that pan rack and drive gear are in correct
mesh.
ELECTRICAL SERVICES
4.1
Refer to wiring diagram in Ops Manual. All wiring to be undertaken by competant
electrician, it is recommended that the mains electrical supply is provided via an earth
leakage circuit breaker.
NOTE:
electrical cables particularly those with copper
conductors suffer from a condition known as ‘relaxation’ which may cause wiring to
work loose over a period of time, it is recommended that the tightness of wiring
connections and terminals are checked following the first month in service.
Содержание CUMFLOW RP150XD MK2
Страница 2: ......
Страница 5: ...OPERATING AND MAINTENANCE MANUAL SECTION 1 GENERAL INFORMATION RP150XD MK2...
Страница 6: ......
Страница 13: ...INSTALLATION DRAWING...
Страница 14: ...OPERATING AND MAINTENANCE MANUAL SECTION 2 INSTALLATION AND OPERATING INSTRUCTIONS...
Страница 15: ......
Страница 23: ...OPERATING AND MAINTENANCE MANUAL SECTION 3 TECHNICAL SPECIFICATION AND MAINTENANCE...
Страница 24: ......
Страница 30: ...LUBRICATION CHART...
Страница 31: ...OPERATING AND MAINTENANCE MANUAL SECTION 4 MIXER SPARE PARTS...
Страница 32: ......
Страница 34: ...RP150XD MK2 MIXING PAN DRIVE...
Страница 36: ...RP150XD MK2 STAR DRIVE ASSEMBLY ASSEMBLED LENGTH OF COUPLING ITEM 3 ON SHAFTS IS 73MM...
Страница 39: ...RP150XD MK2 MIXING STAR ASSEMBLY...
Страница 41: ...RP150XD MK2 MIXING STAR LIFTING ARRANGEMENT...
Страница 43: ...RP150XD MK2 COVERS GUARDS...
Страница 46: ...PAGE INTENTIONALLY BLANK...
Страница 49: ...RP150XD MK2 DECALS AND LOGOS CROKER CUMFLOW RP150XD 1 2 4 5 6 7 8 9 10 11 12 13...
Страница 51: ...OPERATING AND MAINTENANCE MANUAL SECTION 5 ANCILLARY EQUIPMENT SPARE PARTS...
Страница 52: ......
Страница 53: ...RP150XD MK2 FOUR WHEEL PAN TROLLEY...
Страница 56: ......
Страница 57: ...OPERATING AND MAINTENANCE MANUAL SECTION 6 ELECTRICAL SYSTEM...
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ...WINGET 04B dwg 04 03 03 16 09 48 Scaled to fit...
Страница 64: ...WINGET 04C dwg 04 03 03 16 10 57 Scaled to fit...
Страница 65: ...WINGET 04A dwg 04 03 03 16 08 44 Scaled to fit...
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......
Страница 80: ......
Страница 81: ......
Страница 82: ......
Страница 83: ......
Страница 84: ......
Страница 85: ...OPERATING AND MAINTENANCE MANUAL SECTION 7 MISCELLANEOUS...
Страница 86: ......