![WinGD X82-B Скачать руководство пользователя страница 660](http://html1.mh-extra.com/html/wingd/x82-b/x82-b_maintenance-manual_986581660.webp)
5
Put down the SAC to the stowage position.
5.1
Operate the equipment until the SAC is clear of the supports (008,
).
5.2
Operate the equipment until the SAC is in the correct position.
5.3
Use the engine room crane and applicable equipment to move the SAC to the
stowage position.
5.4
Remove the equipment.
Fig 11-18 Scavenge air cooler (example) - put down
001
002
I
008
010
I
003
004
005
006
007
CLOSE UP
•
None
X82-B
AA00-6606-00AAA-520A-A
Maintenance Manual
Scavenge air cooler - remove
Winterthur Gas & Diesel Ltd.
- 660 -
Issue 001 2020-10
Содержание X82-B
Страница 10: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 10 Issue 001 2020 10...
Страница 199: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 199 Issue 001 2020 10...
Страница 335: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 335 Issue 001 2020 10...
Страница 825: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 1 9...
Страница 826: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 2 9...
Страница 827: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 3 9...
Страница 828: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 4 9...
Страница 829: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 5 9...
Страница 830: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 6 9...
Страница 831: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 7 9...
Страница 832: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 8 9...
Страница 833: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 9 9...