background image

STEP 10. 

To attach the cartridge hous-

ing to the antenna, align the snaps on the 

cartridge housing with the snap holes on 

the cartridge housing receptacle on the 

antenna and push the housing into the 

receptacle until it snaps into place. See 

Figure 8.

STEP 11. 

Attach the 75 ohm coaxial cable 

to the cartridge housing. See Figure 8. 

Slide weather boot over connector and 

boot collar.

STEP 12. 

To mount the antenna on the 

mast, loosen nuts on the main boom and 

boom brace mast clamps. Slide both mast 

clamps over the mast pointing the front of 

the antenna (small end) towards stations 

and tighten the boom brace mast clamp 

securely. Let the main boom mast clamp 

slide down the mast until the boom brace 

supports the main boom. Tighten the main 

boom mast clamp securely. See Figure 9.

STEP 13. 

The 75 ohm coaxial cable down-

lead may be secured to the mast by either 

taping it or use of plastic wire ties.

Fig. 5

STEP 7.

 Unfold the reflector booms 

slowly until they lock in place. Then 

unfold the elements on the reflector 

booms. See Figure 6. 

STEP 8. 

To install the boom brace

remove the bolts and hex nuts. Attach 

the boom brace to the reflector boom 

first, making sure that the mast clamps 

are on the same side, see Figure 7. Do

 

not 

tighten the bolt and hex nut. 

STEP 9. 

Swing the boom brace down 

onto the main boom and insert the bolt 

and hex nut,  see Figure 7. Tighten both 

bolts and hex nuts securely. 

Fig. 6

MASTING 

2" OD MAX.

MAST CLAMP

MAST CLAMP 

INSERT

HEX NUT

U-BOLT

STEP 5. 

Unfold the elements of the front 

section of the antenna. The elements should 

be on the top side of the front section of the 

antenna. Remove the bolt and hex nut, (see 

Fig 4) from the tapered end of the front boom 

and slide the tapered end into the front of the 

rear boom. The cartridge housing receptacle 

on the rear section of the antenna is attached 

to the bottom of the rear boom at the factory. 

Replace the bolt, and hex nut. Tighten 

securely. 

STEP 6. 

Unfold UHF directors, as shown in  

Figure 5.

NOTE:

To prevent damage in shipping, the second set of elements from the rear of the 

boom are folded to the opposite side. 

STEP 2.

 Grasp both ends of the second element from the rear of the boom. Lift 

the ends of the element just enough to slide over the other elements to the front 

and rear and ROTATE ABOUT 100° COUNTER CLOCKWISE to lock. See Fig. 1.

STEP 3.

 Unfold the rest of the elements on this side of the antenna to the lock 

position, being sure to alternate the elements. See Figure 2.

STEP 4. 

Turn the antenna over and repeat steps 1, 2 and 3. Again lift and rotate  

the second element just enough to slide over the other elements. See Figure 3. 

Fig. 4

Fig. 7

Fig. 8

Fig. 9

Fig. 1

Fig. 3

Fig. 2

Antenna shown from top 

side with front of rear sec

-

tion pointing away from you. 

Antenna shown from under

-

side with front of rear section 

pointing away from you.

STEP 1.

 Remove the rear section of antenna from carton (long elements). Lay 

it on the ground with the end with the plug pointing toward you. Starting with the 

element nearest you, unfold the first element CLOCKWISE about 80° and click to 

lock position. See Figure 1.

CARTRIDGE HOUSING 

RECEPTACLE

75 OHM COAXIAL

CABLE (DOWNLEAD)

BOOT

COLLAR

CARTRIDGE 

HOUSING 

DOWNLEAD 

JACK

WEATHER BOOT

MAIN 

BOOM

REFLECTOR

BOOM

REFLECTOR

BOOM

ENDS OF CLIPS  

SHOULD POINT AWAY FROM MAIN BOOM

Lift and 

Rotate

Отзывы: