Version: 1/15/16
Page 2 of 4
Step 3
Using two people, place the base upsidedown onto the table top,
lining up the four holes. (Base will sit fl ush with the top)
Step 4
Use the four bolts provided to attach the base to the top. First, loosely
put in all four bolts, then hand tighten. Finish by doing a 1/2 rotation
using your 7/16” wrench. DO NOT USE POWER TOOLS AND DO NOT
OVER TIGHTEN.
Step 5
Not that the base is securely fastened to the top, use two people and
rotate the entire fi re pit back up right.
Step 6
Using the handles, pull the magnetic side door open and set aside.
Place the fi re bowl into the top.
Step 7
Find the inside of the control panel and remove the two red caps
protecting the nozzles. (Note: In-order to show the inner control panel
our images do not have the table top mounted)
Step 8
On the bowl you’ll see a fl exible metal hose coming out. Attach the
other end to the top nozzle of the control panel.
Step 9
Take the black rubber hose and attach it to bottom nozzle of the control
panel.
Step 10
Add your propane tank to the dolly and make sure the gas is turned
off. Take the black rubber hose and attach it to the propane tank. Use a
wrench to go back through and tighten all four connections.
E