background image

MACHINE OPERATION 

SCEX364   86037160   03/12/07 

 

3-11 

 

DOUBLE SCRUB 

For floors which are heavily soiled or have thick 
accumulations of floor finish may not clean 
sufficiently with one pass. In these cases it will be 
necessary to double scrub. 
To double scrub, make the first pass over the 
surface being cleaned with both squeegees up, 
vacuum off, the solution on and brushes down. This 
allows the

 solution to stay in contact with the soil 

while loosening the surface accumulation with the 
brushes. Allow time for the first application to stay in 
contact with the floor. Length of time between the 
first and second pass depends on amount of 
accumulation and the type of chemical being used. 
A second scrubbing with both squeegees down and 
again the solution and brushes on will further loosen 
soil. The additional application of solution will further 
assist the difficult cleaning job. 

 

FOR SAFETY:  When using machine, go slow on 
inclines and slippery services. 

 

EMPTYING AND CLEANING TANKS 

 

1. 

Park the machine next to a floor drain.  Drain 
hose is on left rear corner of the machine. 

 

2. 

Turn the machine power off and set parking 
brake.

 

 
SOLUTION TANK 

1. 

Loosen small drain hose from the retainer, then 
lower hose in direction of the drain. 

 

 

2. 

Remove the solution tank cover. 

 

3. 

Flush the solution tank out with clean water and 
run several gallons of clean water through 
systems. Do not use water hotter than 140°F 
(60°C) to clean tank. Damage may occur. 

NOTE:  Never allow solution to remain in tank.  
Damage to tank, seals and valves could occur.

 

 

4. 

Secure drain hose into the retainer.

 

 
RECOVERY TANK 

1.

  Unhook the large drain hose from the retainer. 

Lower hose in direction of the drain then 
unscrew the T-handle on plug enough to loosen 
plug. Do not stand in front of end of hose. 
Recovered solution will come out with force. 
Slowly remove plug from drain hose. 

 

2.

  Remove the recovery tank dome. Flush the 

recovery tank out with clean water. Do not use 
water hotter than 140°F (60°C) to clean tank. 
Damage may occur. 

 

3. 

Clean off the float shut-off system and inspect 
for free movement of float. The float shut-off 
system is located in the rear of the recovery 
tank. 

 

4. 

Replace

 

the drain plug and secure drain hose in 

bracket. 

 

5. 

If machine is to be stored, leave the recovery 
tank dome off.

 

TANK COVER

RECOVERY

TANK COVER

SOLUTION 

SOLUTION 

TANK DRAIN

TANK DRAIN

RECOVERY

Содержание Saber Cutter 10052350

Страница 1: ...truzioni prima di azionare la macchina Lea las instrucciones antes de utilizar la m quina Lire ce manuel avant d utiliser la machine MODELS SCEX364 10052350 Operating Instructions ENG Bedienungsanleit...

Страница 2: ...__ OVERVIEW The Saber Cutter is a battery powered self propelled hard floor scrubber intended for commercial use The appliance applies a cleaning solution onto a hard floor scrubs the floor with brush...

Страница 3: ...nstalling Scrub Brushes 4 8 Float Shut Off 4 8 Solution Strainer 4 9 Brush Motor Replacement 4 9 Traction Motor Brush Replacement 4 10 Circuit Breakers 4 10 Vacuum Motors 4 11 Actuator Scrub Deck 4 12...

Страница 4: ...The PARTS LIST section contains assembled parts illustrations and corresponding parts list The parts lists include a number of columns of information REF column refers to the reference number on the...

Страница 5: ...ries shops and offices for more than normal housekeeping purposes Maintenance and repairs must be done by qualified personnel If foam or liquid comes out of machine switch off immediately Disconnect b...

Страница 6: ...the equipment Read this information carefully Know when these conditions can exist Locate all safety devices on the machine Please take the necessary steps to train the machine operating personnel FOR...

Страница 7: ...tion of safety labels on the machine If at any time the labels become illegible promptly replace them CIRCUIT BREAKER DECAL 86243530 PRV NO 500565 2 GRADE WARNING SEE MANUAL BATTERY CAUTION 86252520 P...

Страница 8: ...ter for 36 in 90 cm scrub head 12 in 30 0 cm Scrub brush pressure Actuated 0 lbs to 150 lbs 0 kg to 68 kg Scrub brush speed 165 rpm Tires 2 x 10 in 25 4 cm non marking foam filled Casters 2 X 4 in 10...

Страница 9: ...und pressure level at the operator s ear was measured to be 68 dBA This was a nearfield broad band measurement taken in a typical industrial environment on a tile floor This appliance contains no poss...

Страница 10: ...changes in the floor without loosing contact with floor The scrub deck skirt controls the cleaning solution on the floor so that the squeegee can pick it up The brush lift mechanisms are controls used...

Страница 11: ...Recovery Tank Drain Hose 5 Scrub Head Fixed 6 Solution Tank 7 Solution Tank Cover 8 Solution Tank Drain Hose 9 Solution Strainer 10 Rear Squeegee 11 Top Cover 12 Vacuum Motor 13 Recovery Tank Dome 14...

Страница 12: ...CONTROLS SCEX364 86037160 03 12 07 3 5 4 10 11 12 14 15 8 7 6 3 13 16 1 9 5 2 17...

Страница 13: ...uts off machine To shut off machine push the switch To restart machine rotate the switch clockwise 3 SPEED CONTROL KNOB Controls the speed of the machine To increase speed rotate knob clockwise To dec...

Страница 14: ...w to the scrub deck without resetting each time the scrubbing operation is interrupted 9 VACUUM SWITCH Controls the vacuum motor To start vacuum motor press the bottom of the switch To stop vacuum mot...

Страница 15: ...s front wheels to prevent unintentional movement To set parking brake push down to lock notch To release parking brake push down and over out of the lock down notch 15 HOUR METER Records the number of...

Страница 16: ...brakes FILLING SOLUTION TANK FOR SAFETY Before leaving or servicing machine stop on level surface turn off machine and remove key 1 Turn the machine power off 2 Set the parking brake 3 Remove solutio...

Страница 17: ...1 Turn the machine power on 2 Lower the squeegee 3 Turn the vacuum on 4 Select the scrub path width that you wish to clean with 5 Lower the scrub brushes to the floor 6 Turn the scrub brushes on brus...

Страница 18: ...hine 2 Turn the machine power off and set parking brake SOLUTION TANK 1 Loosen small drain hose from the retainer then lower hose in direction of the drain 2 Remove the solution tank cover 3 Flush the...

Страница 19: ...allow motor to dry Store with dome off tank to allow the tank to dry Check scrub deck skirt Check batteries for corrosion cracks and evidence of overheating Check all bearings for noise Check all gas...

Страница 20: ...eegee 3 Scrub Brushes 4 Float Shut Off 5 Solution Strainer 6 Brush Motor 7 Traction Motor 8 Circuit Breakers 9 Scrubhead Fixed and Swinging 10 Vacuum Motor 11 Actuator Scrub Deck Up Down 12 Actuator S...

Страница 21: ...ry cell before and after charging the batteries Never add acid to the batteries use distilled water Do not allow water level to fall below the battery plates Portions of plates exposed to air will be...

Страница 22: ...80 F 27 Add to the specific gravity reading 0 004 4 points for each 10 F 6 C above 80 27 C Subtract from the specific reading 0 004 4 points for each 10 F 6 C below 80 F 27 C TO CHARGE THE BATTERIES W...

Страница 23: ...t The charger gauge should indicate that the batteries are charging 8 When the batteries are fully charged disconnect the charger from the AC wall outlet then disconnect the charger from the batteries...

Страница 24: ...ct pitch in order for the squeegee blade to have the same deflection at each tip as well as the center The knob on the squeegee linkage controls the pitch adjustment The second adjustment is the defle...

Страница 25: ...deflection of the squeegee blades again Repeat steps 1 through 4 until the deflection is equal across the entire rear squeegee blade TO ADJUST AMOUNT OF REAR SQUEEGEE DEFLECTION 1 Choose a smooth leve...

Страница 26: ...hes They will quickly remove ground in dirt black heel marks and spills When used with the proper stripper this pad leaves the floor clean and ready for finishing The scrub brushes should be checked b...

Страница 27: ...ORS 1 With the scrub deck in the up position disconnect brush motor wiring connector from harness 2 Remove scrub brushes or pad drivers 3 Remove retaining bolt lock washer flat washer and star drive f...

Страница 28: ...nd lead 6 When all new brushes are installed Place all in retracted position held into brush holder by spring tension 7 Carefully replace brush cap 8 CIRCUIT BREAKERS Circuit breakers interrupt the fl...

Страница 29: ...ntric the motor will need to be replaced or sent to a qualified service center Important These brushes wear quicker as the length shortens due to increased heat Spring inside brush housing will damage...

Страница 30: ...w connection to lift linkage 6 Connect actuator to lift linkage 7 Check travel of actuator during operation 12 ACTUATOR SCRUB DECK IN OUT REMOVAL REPLACEMENT FOR SAFETY Before leaving or servicing mac...

Страница 31: ...cuum hose from squeegee and loosen both mounting knobs 3 Pull squeegee assembly rearward from the lifting carrier 4 Inspect or repair as necessary and reinstall TO REPLACE OR ROTATE REAR SQUEEGEE BLAD...

Страница 32: ...f squeegee deflection It should deflect 1 4 in 6 25mm across the entire width of the squeegee 4 To increase the squeegee deflection loosen the two knobs on the linkage and lower the squeegee and brack...

Страница 33: ...MAINTENANCE SCEX364 86037160 03 12 07 4 15 RECOMMENDED GREASING 1 2 strokes of Mobiltemp 78 or compatible clay based or calcium based grease...

Страница 34: ...runs slowly Recovery tank full Drain recovery tank Recovery tank float system dirty Clean float system Circuit breaker tripped Reset circuit breaker Loose connection Check motor wires and connections...

Страница 35: ...obstructed Clear obstruction from vent hole No power to machine Battery disconnected Check all battery cable connections Emergency shut off activated Reset Battery connections corroded Clean connectio...

Отзывы: