
17
2.
For the Installer
2.8 Installing, preparing for installation
– The boiler is best transported to the installation site in the crate and this removed once there – Figs. 38 to 49. If
the boiler cannot be taken to the installation site in the crate, remove the crate and various attachments – see
section 2.4.
– The boiler can be installed directly on a non-flammable surface and does not require special foundations.
Using the four set screws, position horizontally or slightly inclined toward the rear.
Removing the crate
Fig. 38
Fig. 39
Fig. 40
Fig. 41
Fig. 42
Fig. 43
Fig. 44
Fig. 45
Fig. 46
Fig. 47
Fig. 48
Fig. 49