10
www.windcrestcnp.com
FRONT
FIG. C
FRONT
5. Lift support frame assembly up to the ceiling making sure the the word “front” on the top support frame faces the
front of the hood where the controls will be located (FIG. D). The key-holes on the top support frame should cover
the wood screws previously installed in the ceiling. Slide support frame towards narrow end of key-holes to lock
the frame in place.
6. Install the last (2) 1-1/2” wood screws with washers into the two remaining corners of the top support frame to
secure it to the ceiling. Tighten all screws.
1
3. The support frame has cut off arms to allow for swinging the
lower grid into position with the upper grid. Once the grids are
set into position, add the lateral support brackets to the two
top support frame cut off arms and their corresponding bottom
support frame arms. Secure lateral support brackets using (12)
M4 x 8 sheet metal screws (FIG. C).
4. For added stability, taller hood heights will also require the
square support bracket to be installed inside the support frame.
Install square support bracket to top support frame arms using
(8) M4 x 8 sheet metal screws. (FIG. E, #1) Top support frame
arms extend past lower support frame bracket with shorter hood
heights. (FIG. E, #2)
FIG. D
FIG. E
2
Installation –
Mounting the Hood