2
REV B
OPM-111
TABLE OF CONTENTS
SAVE THESE INSTRUCTIONS
2
TESTING POLICY
3
SAFETY INFORMATION
3
ANSI SAFETY DEFINITIONS
SPECIFICATIONS 4
PSS21/F
PSS30/F
INTRODUCTION 5
PRODUCT DESCRIPTION
PREPARING THE UNIT
5
UNPACKING
INSTALLATION 5
ENGINE-GENERATOR SET MOUNTING
FUEL INSTALLATION
6
INSTALLING THE FUEL LINE
LIQUID PROPANE VAPOR (LP)
NATURAL GAS (NG)
FUEL PRESSURE
INSTALLING THE BATTERY
8
FUEL PRESSURE TABLES
NG/LP FUEL CONVERSION
SERVICING BATTERIES
BATTERY CHARGING
CONNECTING THE BATTERY CHARGER & BLOCK HEATER
SAVE THESE INSTRUCTIONS
This manual contains important instructions that should be followed
during installation and maintenance of the generator. Read and
understand all instructions in the manual before starting and operating
the generator.
USING THIS MANUAL
Congratulations on your choice of a WINCO generator. You have
selected a high-quality, precision-engineered generator designed and
tested to give you years of satisfactory service.
To get the best performance from your new generator, it is important
that you carefully read and follow the operating instructions in this
manual.
Should you experience a problem please follow the “Troubleshooting
Tables” near the end of this manual. The warranty listed in the manual
describes what you can expect from WINCO should you need service
assistance in the future.
COPY YOUR MODEL AND SERIAL NUMBER HERE
No other WINCO generator has the same serial number as yours.
If you should ever need to contact us on this unit, it will help us to
respond to your needs faster.
MODEL __________________________________________________
SERIAL NUMBER _________________________________________
PURCHASE DATE _________________________________________
DEALER NAME ___________________________________________
DEALER PHONE # ________________________________________
AC ELECTRICAL CONNECTIONS
10
DC ELECTRICAL INTERCONNECTION
11
STARTING PROCEDURE
12
ASCO 185 UL SWITCH
ASCO 300 UL SWITCH
INITIAL START UP
VOLTAGE REGULATOR WIRING
14
TROUBLE SHOOTING TABLES
14
MAINTENANCE SCHEDULE
15
PREVENTATIVE MAINTENANCE
15
AUTOMATIC TRANSFER SWITCH
ENGINE-GENERATOR SET
COLD WEATHER OPERATION
OUTLINE DRAWING
16
THREE PHASE WIRING - DELTA
17
THREE PHASE AC WIRE HIGH AND LOW WYE
17
SINGLE PHASE AC WIRING - 4 LEAD
17
ENGINE HARNESS SCHEMATIC
18
DSE 7310 MKII WIRING DIAGRAM
19
24 MONTH LIMITED WARRANTY
20