Wilson & Fisher SKY996004-B Скачать руководство пользователя страница 2

G

C&2

C&2

C&3

1&2

A&3

A&3

A&1

3&5

3&4

B&1

B&3

B&3

Spring Ball

Spring Wire

Spring Wire

Spring Ball

Spring Ball

A

C

B

Special notice: 

 

Before assembling, make sure that you lay out and iden fy all parts listed below 
in the part list. 

 

All  bolts  should  be  hand  ghtened.  Never  use  powder  tools  or  excessive  force 
during assembly and  ghtening of bolts. 

 

It is recommended to assemble this product with

 

Step 1 
Top frame assembly: 
1)

 

Make tube 3#,4# and corner connector A,B together. 

2)

 

Make tube 3#,4# and top connector C together. 

3)

 

Connect tube 1#,2# with part A,B,C and make sure they click into place. 

Step 2 
Fit on the canopy fabric: 

3)

 

Hook the fabric of legs to a suitable bo om hole on tube 5#, please see

 FIGURE 1.

 

Step 3 
Fix the whole canopy:   
1)

 

Insert one steel stake F into a hole on plas c base D, make it fix on the ground, please see 

FIGURE 1, 

do same  on other  

3  

bases .

 

 

2)

 

Make  one  end  of  the  rope  E  e  with  the  plas c  ring  on  canopy  fabric  corner,  please  see 

FIGURE 2,

 the other end 

with steel stake F , please see 

FIGURE 3,

do same on other 3  

ropes, pull the ropes to suitable 4 direc ons, fix the steel stakes F on the ground. 

 

 

 

FIGURE 1

 

FIGURE 

FIGURE 

3

2

e

ti

ti

2 or more people.

4

4

4

3

3

3

3

3

3

1

1

1

3

3

3

3

5

5

1

2

2

2

2

A

A

C

C

B

B

According to the direction of 
the arrow into the connector.

4)    Connect tube 3# with part A & B to set up the frame top. 

1 )

 

Fit o n  th e  can o p y fab ric G  and  p u ll th e  can o p y fab ric 

htly o ve r th e fram e. 

 

5

5

D

D

D

Отзывы: