background image

en

Installation and electrical connection

16

WILO GVA GmbH 2019-02

The following must be observed as regards storage:

ƒ

Place the mixer on a solid surface 

and secure it against slipping and falling over!

ƒ

The max. storage temperature is -15 °C to +60 °C (5 °F to 140 °F) at a max. relative
humidity of 90 %, non-condensing. Frost-proof storage at a temperature of 5 °C to
25 °C (41 °F to 77 °F) with relative humidity of 40 % to 50 % is recommended.

ƒ

Do not store the mixer in rooms in which welding work is carried out. The resulting
gases or radiation can corrode the elastomer parts and coatings.

ƒ

Protect the mixer from direct sunlight and heat. Extreme heat can cause damage to
the propeller and the coating!

ƒ

Turn the propeller for five full rotations at regular intervals (every 2 – 4 weeks) when
in storage. Doing so presents the drive from jamming and renews the film of lubrica-
tion on the pinions.

ƒ

For information on storing the drive unit, consult and observe the manufacturer’s in-
structions!

After storage, remove any dust and oil from the mixer and check the coatings for dam-
age. Repair damaged coatings before further use.

6

Installation and electrical con-
nection

6.1

Personnel qualifications

ƒ

Electrical work: A qualified electrician must carry out the electrical work.

ƒ

Installation/dismantling: The technician must be trained in the use of the necessary
tools and fixation materials for the relevant construction site.

6.2

Operator responsibilities

ƒ

Observe the locally applicable accident prevention and safety regulations of trade
associations.

ƒ

Observe all regulations for working with heavy loads and under suspended loads.

ƒ

Provide protective equipment and ensure that the protective equipment is worn by
personnel.

ƒ

Demarcate the working area and keep it free from any objects lying around.

ƒ

Unauthorised persons must be kept away from the working area.

ƒ

If the weather conditions (e.g. ice formation, strong wind) mean it is no longer pos-
sible to work safely, stop work.

ƒ

Structural components and foundations must be of sufficient stability in order to al-
low the device to be fixed in a secure and functional manner. The operator is re-
sponsible for the provision and suitability of the building/foundation!

ƒ

Check that the available consulting documents (installation plans, design of the op-
erating space, inflow conditions) are complete and correct.

6.3

Installation

DANGER
Danger due to fluids hazardous to health during installation!

Ensure that the installation site is clean and disinfected during installation. If contact
with fluids that are hazardous to health is possible, observe the following points:

• Wear protective equipment:

⇒ Closed safety goggles

⇒ Mouth protection

⇒ Protective gloves

• Immediately wipe up drips.

• Observe the specifications provided by work regulations! The operator must

make sure that personnel have received and read work regulations!

DANGER
Risk of fatal injury due to dangerous lone working practices!

Work in chambers and narrow rooms as well as work involving risk of falling are dan-
gerous work. Such work may not be carried out autonomously! A second person
must be present for safety reasons.

Содержание Vardo WEEDLESS-F

Страница 1: ...Pioneering for You Wilo Vardo WEEDLESS F 6074816 Ed 01 2019 02 en Installation and operating instructions...

Страница 2: ......

Страница 3: ...t description 10 4 1 Design 10 4 2 Operation in an explosive atmosphere 11 4 3 Type key 12 4 4 Rating plate 13 4 5 Scope of delivery 13 5 Transportation and storage 13 5 1 Delivery 13 5 2 Transport 14...

Страница 4: ...intervals 28 9 5 Maintenance measures 29 9 6 Repairs 32 10 Faults causes and remedies 36 11 Spare parts 37 12 Disposal 37 12 1 Oils and lubricants 37 12 2 Protective clothing 37 12 3 Information on th...

Страница 5: ...ects are reported in writing to the manufacturer within the warranty period Application according to intended use All monitoring devices are connected and were tested before commissioning Exclusion of...

Страница 6: ...Failure to follow the instructions can lead to serious injuries CAUTION Failure to follow the instructions can lead to property damage and a possible total loss NOTICE Useful information on handling...

Страница 7: ...nd experience who can identify and prevent electrical hazards 2 3 Electrical work Electrical work must be carried out by a qualified electrician Before commencing work disconnect the product from the...

Страница 8: ...ting gear based on the prevailing conditions weather attachment point load etc Always attach the lifting gear to the attachment points lifting eyes and ensure they are securely attached The stability...

Страница 9: ...ntenance tasks Risk of injury through crushing and hot operating fluid Wear the following protect ive equipment Sealed safety goggles Protective gloves Safety shoes Only carry out the maintenance task...

Страница 10: ...rmittent and continuous duty in drainage and sewage with and without faeces as well as in sludge For suspension of solid matter For homogenisation Intended use also includes compliance with this manua...

Страница 11: ...ngle 30 35 40 or 45 of the propeller blades A cover cap is fitted to the hub to protect the tensioning kits and the components fixing the propeller blades in place against corrosion and dirt 4 1 3 Mat...

Страница 12: ...00 A 00 F Mixer version F vertical mixer in fixed installation S vertical mixer in floating installation M vertical mixer with two propeller levels 5 Size A1 Gear motor version depending on size for 3...

Страница 13: ...Germany Fig 4 Rating plate Type Product name S N Serial number MFY Date of manufacture according to ISO 8601 JJJJ year ww calendar week P2 Required rated power of the mixer n2 Propeller speed MS Diame...

Страница 14: ...ting and lowering Do not exceed the maximum permissible bear ing capacity of the lifting equipment Check that lifting equipment is functioning properly before use CAUTION Material damage due to incorr...

Страница 15: ...ANGER Danger from fluids hazardous to health Risk of fatal injury if the mixer is used in fluids hazardous to health Decontaminate the mixer after dismantling and before carrying out any other work Ob...

Страница 16: ...applicable accident prevention and safety regulations of trade associations Observe all regulations for working with heavy loads and under suspended loads Provide protective equipment and ensure that...

Страница 17: ...e that the mixer is not damaged during lifting and lowering Do not exceed the maximum permissible bear ing capacity of the lifting equipment Check that lifting equipment is functioning properly before...

Страница 18: ...t 4 Support structure 5 Motor plate fixation Attachment points installed on the motor plate Work area demarcated and free of any other objects or contaminants Ensure work is carried out by two persons...

Страница 19: ...NOTICE Other setting angles may only be used following consultation with cus tomer service Defining the direction of thrust The mixer can exert thrust either upwards or downwards in the operating spac...

Страница 20: ...on the union insert The angle specification must be visible when inserted NOTICE Ensure the propeller blade alignment matches the direction of thrust 2 Place flat gasket on threaded pin 3 Insert prop...

Страница 21: ...uences such as direct sunlight or prolonged periods of frost If it is not possible to flood the basin adhere to the storage requirements See Storage 15 CAUTION Environmental factors such as direct sun...

Страница 22: ...installation and operating instructions available in a language the person nel can understand Make sure that the installation and operating instructions are read and understood by all personnel All sa...

Страница 23: ...on of rotation is defined in the system configuration 3 If the direction of rotation is incorrect have the electrical connection changed by a qualified electrician 4 Check the direction of rotation ag...

Страница 24: ...talling a level monitoring device for applications where the fluid level fluctuates significantly NOTICE Take note of additional literature To ensure proper use additionally read and observe the manuf...

Страница 25: ...per use additionally read and observe the manufacturer instructions The mixer is deactivated during decommissioning but remains installed This ensures that the mixer is always ready for operation To p...

Страница 26: ...for safety reasons WARNING A lack of protective equipment may result in hand and foot injuries or the risk of falling Danger of serious injuries during work Wear the following protective equipment Sa...

Страница 27: ...d drain the gear oil and dispose of it in accordance with local regulations Fill the gear with preservation oil Consult manufacturer s instructions Dismantling is complete Place the mixer in storage S...

Страница 28: ...ations Use only original parts of the manufacturer Use of parts other than the original parts releases the manufacturer from any liability Collect any leakage of fluid and operating fluid immediately...

Страница 29: ...s DANGER Danger due to fluids hazardous to health when carrying out maintenance tasks The mixer is not dismantled to carry out these tasks Personnel may come into con tact with fluids that are hazardo...

Страница 30: ...reakdown In this regard it is re commended to use remote monitoring for regular inspections 9 5 2 Visual inspection for wear of the mixer Inspect individual components propeller hub etc for damage and...

Страница 31: ...the connection piece into the oil filler opening 3 Connect the compressed air to the connection piece 4 Remove the dummy plug from the oil drain line 5 Attach the drain hose to the oil drain line 6 Pl...

Страница 32: ...air work the following applies Wipe up drips immediately Always replace O rings gaskets and screw locking devices For torques see Appendix 38 Never use inappropriate force when carrying out this work...

Страница 33: ...points Prepare the operating space installation site Clean free of coarse solids Dry Frost free Decontaminated Work must always be carried out by two persons Avoid any painful or tiring body postures...

Страница 34: ...ng the hub New flat gasket to hand Stretching device to hand 1 Place the flat gasket on the lower end of the mixer shaft and slide up as far as it will go 2 Place the rear tensioning kit on the mixer...

Страница 35: ...laced Install the mixer and put into service Additional information for the individual work steps See Replacing the hub 34 See Replacing the drive unit 35 9 6 6 Replacing the drive unit Removing the m...

Страница 36: ...mask Protective gloves The equipment listed here is the minimum requirement observe the spe cifications of work regulations The operator must make sure that person nel have received and read work regu...

Страница 37: ...t contact customer service Customer service can assist in the following ways Telephone or written support On site support Inspection and repair at the factory Costs may be incurred if other services a...

Страница 38: ...t Size Mixer shaft Thread Tightening torque Shrink disc inside diameter Mixer D62 5 71 45 M6 6 8 Nm 5 ft lb D75 6 90 56 M8 16 Nm 12 ft lb D90 7 95 67 M8 16 Nm 12 ft lb D100 8 106 71 M8 16 Nm 12 ft lb...

Страница 39: ...explosive areas The operator is responsible for defining the potentially explosive area Only Ex rated mixers may be used within potentially explosive areas Ex rated mixers must be labelled as such on...

Страница 40: ......

Страница 41: ......

Страница 42: ......

Страница 43: ......

Страница 44: ...Pioneering for You Local contact at www wilo com contact WILO GVA GmbH Dieselstra e 6 42489 W lfrath Germany T 49 0 2058 9210 0 F 49 0 2058 9210 20 info gva net de www gva net de...

Отзывы: