Williamson-Thermoflo PLB-112 LOW-BOY Скачать руководство пользователя страница 5

 

 

PLB-112 

Oil Furnaces

 – 

Furnace Manual

 

11/13  

5

 

1.5.

 

VENTING 

Poisonous carbon monoxide gas, fire and 
explosion hazard. 

Read and follow all instructions in this section. 

Failure to properly vent this furnace can result 
in death, bodily injury and/or property damage. 

To ensure the safe and proper functioning of an 
oil furnace, it must always be connected to a 
flue with sufficient draft or to an approved side-
wall venting system. In addition, it is strongly 
recommended to perform a complete inspection 
of all the existing venting systems. 

Poisonous carbon monoxide gas hazard. 
Never install a hand operated damper in the 
vent pipe. However, any Underwriters 
Laboratories listed, electrically operated 
automatic type vent damper may be installed if 
desired. Be sure to follow the instructions 
provided with vent damper. Also, read and 
follow all instructions in this section of the 
manual. 

Failure to properly vent this furnace or other 
appliances can result in death, bodily injury 
and/or property damage.

 

1.5.1.

 

Masonry chimney 

This furnace can be vented into an existing masonry chimney. 
However, the unit must not be vented into a chimney into which a 
solid fuel burning furnace is already being vented. 
Before venting this furnace into a chimney, its condition must be 
checked and repairs made, if necessary. Also, the chimney lining 
and dimensions must conform to local and national codes. 

1.5.2.

 

Factory Built Chimneys 

Oil fired furnaces are approved for use with “L” type vents. The 
unit may also be used with an approved chimney of proper 
dimensions and temperature ratings as specified in the 
installation code. Refer to chimney manufacturer’s instructions for 
proper installation. 

1.5.3.

 

Draft Regulator 

It is recommended that a draft regulator be installed in cases 
where the draft is either high or variable due to external 
conditions. Follow the instructions provided with the regulator. 

1.5.4.

 

Side-wall Venting 

The heating unit is approved for side-wall venting. This system is 
comprised of a model VTK-54 side-wall venter and a 4” insulated 
vent pipe, model IFV-410, IFV-420. Refer to the installation 
instructions provided with the venting system. 

1.6.

 

BLOCKED VENT SHUT-OFF DEVICE 

(BVSO)

 

 FOR CHIMNEY VENTING - 

OPTIONAL 

It is imperative that this device be installed by a 
qualified service technician. 
A positive pressure venting system (Sealed 
Combustion System or Direct Vent) must NOT 
use the BVSO. Follow the instructions supplied 
with the venting system. 

 
This device is designed to detect the insufficient evacuation of 
combustion gases in the event of a vent blockage. In such a case 
the thermal switch will shut down the oil burner. The device will 
then need to be re-armed MANUALLY. 
Refer to the detailed instructions and wiring diagrams supplied 
with the BVSO for the installation and wiring procedures. The 
length of wires supplied with the unit is such that the safety 
device must be installed between the flue outlet of the appliance 
and the draft regulator, as indicated in the instructions. 
It is also essential that the BVSO be maintained annually. For 
more details refer to the instructions supplied with the device 
itself, as well as Section 2 of this Manual. 

1.6.1.

 

BVSO Performance Test 

The purpose of the following test is to check that the electrical 
outlet on the furnace, designated to the BVSO, is functional. 
1. 

Start up the burner; 

2. 

Disconnect one wire of the BVSO; 

3. 

The burner must shut-off immediately, while the blower 
continues to run to the end of the cool-down cycle. 

If the test is not in line with the above, call a QUALIFIED 
SERVICE TECHNICIAN. 

Figure 5: BVSO mounting installation: Upflow with vertical 
exhaust (OPTIONAL) 

 

 

Figure 6: BVSO mounting installation: Upflow with horizontal 
exhaust (OPTIONAL) 

 

 

 

# 9

# 9

Содержание PLB-112 LOW-BOY

Страница 1: ...y could result in severe personal injury death or substantial property damage When calling or writing about the furnace Please indicate furnace model number and serial number from rating label You may...

Страница 2: ...bows 20 Always connect and seal a return air duct to the furnace unless the furnace is located in a large space such as an unpartitioned basement Route the return air duct to an adjacent room if no re...

Страница 3: ...to a hazardous electrical condition and to premature failure of the equipment The minimum clearances from combustible material for each of the positions are specified in Table 1 If the furnace is ins...

Страница 4: ...r to the burner manufacturer s instructions Also the burner must be installed always in the same way independently of the furnace orientation 1 Position the mounting gasket between the mounting flange...

Страница 5: ...where the draft is either high or variable due to external conditions Follow the instructions provided with the regulator 1 5 4 Side wall Venting The heating unit is approved for side wall venting Th...

Страница 6: ...xposure to the following substances a Permanent wave chemicals for hair b Chlorinated waxes and cleaners c Chlorine based swimming pool chemicals d Water softening chemicals e De icing salts or chemic...

Страница 7: ...nstalled with a 4 tons air conditioning evaporator coil Heating mode airflow is still 1050 CFM Cooling mode air flow use Equation 3 4 CFM 4 x 400 1600 CFM The larger number is 1600 CFM cooling so the...

Страница 8: ...7 6 6 900 14 58 41 31 25 21 19 17 14 12 11 10 9 8 8 7 7 7 1000 16 64 45 34 28 23 20 18 15 13 11 10 9 9 8 8 7 7 1100 16 72 49 38 30 25 22 19 16 14 12 11 10 9 9 8 8 7 1200 16 54 41 33 27 24 21 17 15 13...

Страница 9: ...600 12 59 38 28 22 19 16 15 13 700 12 69 44 32 25 21 18 16 15 13 800 14 50 36 29 24 20 18 16 14 900 14 56 41 32 26 22 20 18 15 1000 16 63 45 35 29 24 22 19 17 15 1100 16 69 49 38 31 26 23 21 18 16 120...

Страница 10: ...same the RED wire must be moved to UNUSED LEADS on the electronic board and the jumper provided with the BLUE wire must be used between the HEAT and COOL terminals The blower start stop delays can be...

Страница 11: ...he blower rail locking screws are well tightened 3 The Blocked Vent Shut Off BVSO is installed according to instructions for chimney venting 4 The oil supply valve is open 5 The burner Reset button is...

Страница 12: ...himney installation and 0 05 to 0 17 W C for direct vent installation A high pressure condition may be caused by excessive combustion air due to the air band being too wide open or a lack of flue draf...

Страница 13: ...heat exchanger and combustion chamber should be inspected to determine if replacement is required 8 After the cleaning replace the heat exchanger baffles flue collar plate and oil burner 9 Readjust t...

Страница 14: ...rough furnace checked not to exceed 85 F and the blower speed adjusted if necessary 19 Was the thermostat heat anticipator set per wiring diagram 20 Was the burner started and tested per burner manual...

Страница 15: ...__________ Serial number __________________________________ Date installed ___________________________ Installation instructions have been followed Checkout sequence has been performed Above informati...

Страница 16: ...zing Maximum fuse size amps Ship weight pounds PLB 112 DD 55 75 1 x 20 x 20 or 2 x 16 x 20 115 60 1 12 6 15 2 20 195 PLB 112 VS 60 72 1 x 20 x 20 or 2 x 16 x 20 115 60 1 12 2 14 7 15 195 0 25 w c 0 50...

Страница 17: ...112 VS Model Input BTU h Firing rate USGPH AFUE Nozzle Delavan Pump pressure PSIG Burner tube insertion length Inch Combustion air adjustment Turbulator Damper 95 200 0 68 86 6 0 60 70A 130 1 2 6 112...

Страница 18: ...C 1 OFF 2 ON 3 0 1200 1320 1080 D 1 ON 2 ON 2 5 1000 1100 900 SW4 DELAY DIP switch position HEAT INPUT USGPH PreRun On Delay CFM Level Time ShortRun On Delay CFM Level Time Off Delay CFM Level Time A...

Страница 19: ...PLB 112 Oil Furnaces Furnace Manual 11 13 19 5 DIMENSIONS AND RATINGS continued Figure 9 Wiring Diagram 4 Speed Motor PSC...

Страница 20: ...PLB 112 Oil Furnaces Furnace Manual 20 11 13 5 DIMENSIONS AND RATINGS continued Figure 10 Wiring Diagram Variable Speed Motor ECM...

Страница 21: ...PLB 112 Oil Furnaces Furnace Manual 11 13 21 6 COMPONENT AND REPLACEMENT PARTS Figure 11 Parts List With 4 Speed motor PSC B50128A...

Страница 22: ...TER RACK 26 B03553 01 ELECTRICAL BOX SPACER 27 B03549 01 ELECTRICAL BOX 28 R02R003 HIGH LIMIT L195 30F 1 75 in 29 B03550 01 ELECTRICAL BOX COVER Panel only 30 F06F015 ZINC WASHER 1 7 16 31 Z99F061 SIG...

Страница 23: ...PLB 112 Oil Furnaces Furnace Manual 11 13 23 6 COMPONENT AND REPLACEMENT PARTS continued Figure 12 Parts List With variable speed motor ECM B50129A...

Страница 24: ...ION 25 B03711 01 RIGHT ANGLE FILTER RACK 26 B03553 01 ELECTRICAL BOX SPACER 27 B03534 01 ELECTRICAL BOX 28 R02R003 HIGH LIMIT L195 30F 1 75 in 29 B03550 01 ELECTRICAL BOX COVER Panel only 30 F06F015 Z...

Страница 25: ...f the furnace oil burner should shut down on flame failure the burner primary control will lock out Ask your service technician to show you the correct procedure to reset the primary control button NE...

Страница 26: ...PLB 112 Oil Furnaces Furnace Manual 26 X40207 Rev B 11 13...

Отзывы: