background image

P:

 2 / 3

 

 

 
 

Connect the two points (A, B) with a light pencil line.  Use a level to ensure that the line is level. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Make two insertion marks (C, D) centered along the line using the measurement 

“a”. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Use a stud-finder to determine if there is a wall stud[s] located at [each] either insertion mark.  
Install the proper hardware, as shown below.  

Note that the head of each screw resides about 3/8” from the wall. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

For stud mounting:

 

Tips: 

The anchor is self-drillable. 
No pilot hole required. 

For non-stud mounting:

 

Отзывы: