Assembly Instructions
Steam Roller D375, D376, D377 & Traction Engine D415, D416, D417
Overview
Stage 1, Front Part
Stage 6, Boiler Assembly
Operating instructions
Stage 2, Burner Chamber Rear
Stage 7, Burner, Front Connection Functioning of the original engine
Stage 3, Burner Chamber Front
Stage 8, Steering Mechanism
The Energy Transformation
Stage 4, Flywheel Shaft
Stage 9, Rear Rollers
History
Stage 5, Cylinder
Stage 10, Roof and Chimney
Accessories
Special Notes on the Assembly
1.
The assembly takes approx. 3-4 hours. Please allow sufficient time in order to avoid too many
interruptions.
2.
This is a valuable, demanding model. The assembly requires quiet, concentration and manual
dexterity.
3.
These instructions are applicable to both the steam engine as well as the traction engine. Please
refer to the relevant text/picture.
4.
The assembly should be carried out on a clean even table, so that no parts are lost.
5.
All parts have been checked several times and fit into each other. If something does not fit, do not
use force but study the assembly instructions/illustrations again.
6.
Before operating the steam engine, please read and observe the operating instructions carefully.
7.
After longer periods of operation, individual screws might need tightening.
Note: Brass and black/brass models. The brass parts are treated with a clear lacquer to prevent tarnishing.
After usage and to prevent tarnishing, apply a further coat of clear lacquer.
Text & illustrations: Wilesco Wilhelm Schröder GmbH & Co., Germany