background image

Y A K

R A K   K A

R E I R

INSTALLING THE RUDDER SYSTEM

Step 1-4

Step 2-1

120/140/160i

160

Step 2-1

Step 3-4

INSTALLING THE RUDDER

The rudder system consists of the rudder assembly, rudder 

mounting bracket, rudder rest to secure the rudder blade when 

stowed on deck, rudder uphaul line to provide for deployment 

and retrieval of the rudder blade, and the steering system to allow 

rudder to be angled right or left to guide kayak.

STEP 1:  INSTALLING THE RUDDER BRACKET

1

 Remove the two fi ller screws from the stern of the kayak 

and discard.

2

 Remove the split ring from the rudder pin and remove the 

bracket assembly  from the rudder.

3

 Install a lock washer on both hex head bolts and slide the 

bolts into the rudder bracket, placing a small amount of 
Loctite® adhesive on the bolt threads.

4

 With  the  stop  pin  of  the  rudder  bracket  facing  upwards, 

start the bolts into the stern 

(Illustration 1-4)

. Tighten the 

bolts securely using a 7/16” deep well socket, making sure 
the bracket is fl ush against the stern and straight up and 
down.

STEP 2: INSTALLING THE CARRYING HANDLE AND  

 

 

RUDDER REST

1

 There  are  three  different  carry  handle  systems  used  on 

Tarpons.  The  hardware  for  either  installation  is  provided. 
An illustration of the each style of handle is shown at right 
(Illustrations 2-1).

Tarpon 120, 140

: Back out screws holding existing carry 

handle  at  stern  of  kayak.  Replace  with  provided  carry 
handle included with kit (#3290-0120) that has addition 
of  bungee  cord  loop.  Use  existing  hardware  to  install 
replacement  carry  handle,  making  sure  that  bungee  loop 
faces forward. To secure rudder blade in stowed position, 
fl ip blade onto deck and secure under bungee loop. 

Tarpon  160i

:  Measure  11  1/2”  forward  from  stern  along 

center line of deck and locate raised circle molded in deck. 
Drill 5mm hole at indent in center of circle. Secure round 
pad  eye  with  assembled  loop  of  3/16”  bungee  to  deck 
with 10/32 x ¾” screw and nylon lock nut. Orient so that 
bungee loop faces towards bow of kayak. 

  Tarpon  160

:  Locate  raised  fl at  mounting  panel  on  deck 

between stern and carry handle. Center V-block rudder rest 
on panel so that center notch will contain rudder blade and 
mark 2 mounting holes in base of rudder rest on hull. Drill 
2 5mm mounting holes through deck. Secure V-block with 
rivets provided. To secure blade in rest, fl ip blade forward 
so that it rests in center notch of V-block and secure with 
bungee over blade. 

STEP 3:  INSTALLING THE RUDDER UP HAUL LINE 

The uphaul line allows you to raise and lower the rudder and 

will be routed along the top of the deck along the right side of 

the kayak. It will run from the rudder to a ? tting near the cockpit, 
guided by a number of round pad eyes. (Illustration 3)

1

 Insert  rudder  assembly  in  mounting  bracket  (does  not 

have to be secured at this time). Position the rudder in the 

REVISION

1.0

4/20/05

DATE

Отзывы: