WIKORA WBO 305 UNO Скачать руководство пользователя страница 8

© Wikora GmbH 

Page 8  

      As of 5/9/2014 

 

 

      Errors excepted. 

9  Installation record 

 

The installation has been completed according to DIN and the technical rules in force. In addition, the customer has received 
instruction concerning the operation and maintenance. 
 

 

 

 

Place………………………………………………..   

 

 

 

Date………………………………………………………… 

 
 
Customer  

 

 

                               

 

 

 

 

Installer   

 

 

 

 

 

 

 

 

 

 

 
……………………………………………………. 

 

 

 

 

………………………………………………………………. 

Signature  

 

 

 

 

                  

 

 

 

 

 Signature 

 
 
 
Place of installation: 

……………………………………………………………………………………………………………………… 

 
 
Name: 

 

 

        ……………………………………………………………………………………………………………………... 

 
 
ZIP Code/Place: 

 

…………………………………………………..…………………………………………………………………. 

 
 
Street: 

 

 

        ……………………………………………………………………...……………………………………………… 

 
 
Phone:   

 

        ……………………………………………………………………………...……………………………………... 

 
 
Tank model:   

        ……………………………….   

 

 

   Serial number …………….………………..……………… 

 
 
Date of invoice                ………………………………………………………...………………………………………………………….. 
 
 

Anode maintenance record 

 

Date 

Visual examination 

of anode 

Exchange of 

anode 

Sig stamp of installer 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
In the case of reclamation, the receipts for maintenance must be provided as proof. Please complete the data sheet, including 
the reason for reclamation, and submit to Wikora. 
 
Submitting the maintenance record does not ensure any promise of guarantee or claim. 

 

 
 

 

Содержание WBO 305 UNO

Страница 1: ...enance record must be entirely completed and the user has to be instructed accordingly Efficient operation can only be guaranteed if the instructions of this manual are followed Warranty does not cove...

Страница 2: ...reasons 3 bends or a length up to 4 m are required then the entire exhaust line must be designed one nominal size larger More than 3 bends or a length exceeding 4 m is prohibited The exhaust pipe mus...

Страница 3: ...1422 758 1740 858 243 290 905 1750 WBO 305 WPSOL 500 610 215 1422 758 1740 1397 958 858 243 290 905 1750 Chart1 W Tilting dimension Connections Type WBO 305 UNO WBO 305 DUO WBO 305 H WBO 305 WPSOL Co...

Страница 4: ...f heat exchanger lower upper litre 8 6 8 6 5 7 19 5 8 6 13 5 Surface of heat exchanger lower upper m 1 45 1 45 0 85 3 00 1 45 2 1 Flow rate of heat exchanger lower upper m h 2 4 2 4 2 4 2 4 2 4 2 4 Pr...

Страница 5: ...e appropriate dimensions and be correctly installed The installation company is responsible for the correct execution of work and for the safe and careful insulation of the pipes When connecting to a...

Страница 6: ...Only use an approved decalcifier Screw the flange cover hermetically after the cleaning process by using a new flange seal Fill the tank and check all connections for tightness Finally replace the ins...

Страница 7: ...s been modified through the installation of externally supplied parts or through irregular professional maintenance Subject to our general terms and conditions Legal warranty 2 years Guarantee years C...

Страница 8: ...r Signature Signature Place of installation Name ZIP Code Place Street Phone Tank model Serial number Date of invoice Anode maintenance record Date Visual examination of anode Exchange of anode Signat...

Отзывы: