![Wicksteed PICK UP STICKS TWELVE Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/wicksteed/pick-up-sticks-twelve/pick-up-sticks-twelve_manual_978823009.webp)
PAGE OF
5
16
Prop post labelled 009 into the foundation hole. Using the dimensions below, secure posts 015 & 016 to posts 004 & 009 using the supplied Coach Bolts
into the pre-drilled holes (post 009 does not have a pre-drilled hole to secure post 015 so this will need to be pre-drilled prior to securing with a
Coach Bolt) Ensure post 009 has a scollop at the top of the post which will also point in the correct direction for the Trapeze Swing.
003
004
009
015
016
6
7
8
9
SURFACE LEVEL
5
9
5
.0
1
5
5
0
.0
1
2
9
1
.5
6
9
5
.0
015
016
004
009