Space requirements & Safety Clearances

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 
 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

Installation instructions

The 

Activitynet14

 Activity Net is delivered in three sections.

Section One is the polished stainless stell mast which is to be mounted over the 

central spigot of the foundation steelwork leaving the top of the mast to accept 

the aluminium dome.  This is attached to the top of the net.
Section Two is the net, complete with aluminium dome to be inserted into the top of 

the mast.
Section Three is the foundation steelwork.  This comprises of four galvanised 

corner anchors, one central galvanised spigot and four safety anchors. The package 

will also contain four rigging screws for attaching and tensioning the net at each 

corner to the foundation steelwork.  
Section Four is the galvanised corner boxes in flat pack form, including fittings.

Corner Anchor

x4

Rigging Screw

x4

Central Spigot

x1

Corner Box

x4

Safety Anchor

x4

Содержание Activitynet14

Страница 1: ...4 Activity Net has been designed to be used by children from 3 years of age and has been manufactured to exceed the European Playground Standard EN11761 1 2017 and EN1176 11 2014 The following install...

Страница 2: ...to the top of the net Section Two is the net complete with aluminium dome to be inserted into the top of the mast Section Three is the foundation steelwork This comprises of four galvanised corner anc...

Страница 3: ...Corner Foundation Corner Box positions for concreting Day Two 1 Concrete Steelwork Day Three 1 Final erection of Activity Net 2 Laying of rubber safety surface material The foundation should be left...

Страница 4: ...of the hole in the anchor 50 800 355 Safety anchor positioned in hole at back of box The eye of the anchor is directly over the front of the concrete block Safety Anchor Product Activiynet14 Corner F...

Страница 5: ...rete to be in 30 N mm2 mix Total volume required 3 712 cubic metres When Installing the four corner anchors it is extremely important to ensure the eyes of the anchor and are held securely during conc...

Страница 6: ...ly around the mast then tighten the locknuts on the rigging screws 4 Connect the second bow shackle on the loop of wire to th esafety anchor this is a precausionary measure in case the rigging screw i...

Страница 7: ...riorating 6 Connections and bolts are secure and tight 7 Bearings are free running 8 Safety surface if installed not compacted damaged or contaminated Within the corner box chambers foundations and st...