
31
5.
Put the second foldable frame on top of the first one. Use the locking
pins to secure the upper foldable frame to the lower foldable frame.
Tip, while putting on the next frame the bottom frame can be se-
cured by temporarily mounting a brace or a platform on the bottom
frame.
6.
Fit the diagonal brace between the foldable frames.
7.
Put the platform at desired height, lock the platform locking. The
platform should be placed horizontal.
8.
Fit the guard rail, five horizontal braces, the highest platform. The
guardrail should be at least 1m high.
9.
Put the toe board around the platform. (fig.3 page 31)
The tower is now assembled and ready to use. Always climb inside the
tower, never on the outside. Do not over reach when working from the
scaffold.
DISMANTLING
Follow the assembling instructions in inverted order. Be careful when
handling and transporting the components so that the parts are not
damaged.
ASSEMBLING INSTRUCTIONS STABILIZERS & TOE BOARD
30
0
1 m
Fig 1.
Fig 2.
Fig 3.