
DAB Submersible Pump Installation Instructions 2013 rev 1
6
SINGLE PHASE 240 VOLT CABLE SELECTION
TESLA
3.2
4.4
5.9
8.2
10.5
15.3
240V MOTOR PSC
kW (HP)
0.37
(0.5)
0.55
(0.75)
0.75
(1.0)
1.1
(1.5)
1.5
(2.0)
2.2
(3.0)
Metric
Cable
Stranding
Area
mm2
metres
metres
metres
metres
metres
metres
7/0.50
1.5
94
67
49
36
29
19
7/0.67
2.5
174
123
91
67
53
36
7/0.85
4.0
279
197
146
106
85
58
7/1.04
6.0
417
296
218
159
126
87
7/1.35
10
701
496
366
268
213
147
7/1.70
16
1117
791
585
426
339
235
THREE PHASE 415 VOLT CABLE SELECTION
TESLA
1.5
1.8
2.3
3.3
4.2
5.7
8.0
9.6
13.5
16.8
415V MOTOR
kW (HP)
0.37
(0.5)
0.55
(0.75)
0.75
(1.0)
1.1
(1.5)
1.5
(2.0)
2.2
(3.0)
3.0
(4.0)
4.0
(5.5)
5.5
(7.5)
7.5
(10.5)
Metric
Cable
Stranding
Area
mm2
metres
metres
metres
metres
metres
metres
metres
metres
metres
metres
7/0.50
1.5
267
240
185
133
104
77
55
46
33
27
7/0.67
2.5
491
442
340
245
192
142
101
84
61
49
7/0.85
4.0
789
710
546
395
308
229
161
135
98
79
7/1.04
6.0
1180
1062
817
590
462
342
241
202
147
118
7/1.35
10
1982
1784
1372
991
775
575
405
339
246
198
7/1.70
16
3158
2843
2186
1579
1236
917
646
541
392
315