3
To supply the required 3 or 4 wire, single phase, 120/240 volt, 60 Hz., AC only electrical supply (or 3 or 4 wire, 120/208 volt electrical
supply, if specified on the serial/rating plate) on a separate 30-amp circuit, fused on both sides of the line. A time-delay fuse or circuit
breaker is recommended. Connect to an individual branch circuit.
ELECTRICAL REQUIREMENTS
VENTING REQUIREMENTS
Recommended Styles:
Acceptable Style:
Louvered hood
Box hood
Angled hood
E
xhaust venting: Exhaust your dryer to the outside. 4" (102 mm)
diameter vent is required. Rigid or flexible metal exhaust vent
must be used. Do not use plastic or metal foil vet. Exhaust hood
must be at least 12" (305 mm) from the ground or any object that
may be in the path of the exhaust.
Clearances
Side Clearances
Front/Back/Top
(recommended/minimum) (recommended/minimum)
24 in.
2
(155 cm
2
)
48 in.
2
(310 cm
2
)
3"
(76 mm)
3"
(76 mm)
Closet
door
Front
View
Recessed area or closet installation
Vent System Chart, 27" Models
Number of
90° turns
or elbows
Type
of vent
Box/louvered
hoods
Angled
hoods
1
2
0
Rigid metal
Rigid metal
Rigid metal
37 ft. (11.3 m)
32 ft. (9.7 m)
23 ft. (7.0 m)
35 ft. (10.7 m)
27 ft. (8.2 m)
19 ft. (5.8 m)
The “Vent System Chart” provides venting requirements that
will help achieve best drying performance.
NOTE:
Side exhaust installations have a 90º turn inside the
dryer. To determine maximum exhaust length, add one 90º
turn to the chart.
Vent System Chart, 24" Models
Number of
90° turns
or elbows
Type
of vent
Box/louvered
hoods
Angled
hoods
1
2
0
Rigid metal
Rigid metal
Rigid metal
43 ft. (13.1 m)
33 ft. (10.1 m)
23 ft. (7.0 m)
36 ft. (11.0 m)
26 ft. (7.9 m)
16 ft. (4.9 m)
1"/0"
(25 mm/0 mm)
1"/0"
(25 mm/0 mm)
5"
(127 mm)
12"
(305 mm)
1"
(25 mm)
(Closet)