5
Install the Tubing and Water Valve
Prepare the Water Valve Tubing
1. Untape the coiled flexible tubing coming from the water valve
and straighten it.
2. Starting at the top of the compression nut on the water valve,
measure 32" (81.28 cm) and mark the location on the tubing.
3. Using a pair of scissors, make an even cut across the tubing
at the mark. Discard the excess tubing.
Install the Water Valve
1. Insert the 2-pin connector over the water valve solenoid
terminals as far as possible. You can position the connector
with the wires at either terminal.
2. Mount the water valve to the mounting holes in the cabinet
frame with
¹⁄₂
" hex-head machine screws.
Install the Tubing Clips
1. Peel the backing from the adhesive strips on the tubing clips.
2. Press the clips against the back of the freezer in the locations
shown below.
Connect the Water Valve Tubing
1. Position the water valve tubing clamp with the round hole
facing toward you and slide it over the end of the fill tube
spout.
NOTE: One of the flanges on the water valve tubing clamp is
made for a threaded screw and one side has a round hole.
2. Thread a
¹⁄₂
" hex-head sheet metal screw into the water valve
tubing clamp and finger tighten.
3. Place the metal water tube insert into the water valve tubing.
A. Compression nut
B. Water valve
A. 2-pin connector
B. Water valve
C.
¹⁄₂
" hex-head machine screws
32"
(81.28 cm)
A
B
A
B
C
A. Fill tube
B. Water valve
A. Water tube insert
B. Water valve tubing
C. Fill tube spout
D. Water valve tubing clamp
E.
¹⁄₂
" hex-head sheet
metal screw
A
B
A
E
B
D
C