background image

11

VENTING DESIGN SPECIFICATIONS

This section is intended for architectural designer and 
builder/contractor reference only.

NOTES:

Vent materials needed for installation are not provided with 
microwave hood.

We do not recommend using a flexible metal vent.

To avoid possible product damage, be sure to vent air outside, 
unless using recirculation installation. Do not vent exhaust air 
into concealed spaces, such as spaces within walls or 
ceilings, attics, crawl spaces or garages.

For optimal venting installation, we recommend:

using roof or wall caps that have back draft dampers

using a rigid metal vent

using the most direct route by minimizing the length of the 
vent and number of elbows to provide efficient performance

using uniformly sized vents

using duct tape to seal all joints in the vent system

using caulking compound to seal exterior wall or roof opening 
around cap

not installing 2 elbows together, for optimal hood performance

If venting through the wall, be sure that there is proper clearance 
within the wall for the damper to open fully.
If venting through the roof, and rectangular to round transition is 
used, be sure there is at least 3" (7.6 cm) of clearance between 
the top of the microwave oven and the transition piece. See 
“Rectangular to Round Transition” illustration.

Rectangular to Round Transition

NOTE:

 The minimum 3" (7.6 cm) clearance must exist between 

the top of the microwave oven and the rectangular to round 
transition piece so that the damper can open freely and fully.

Recommended Standard Fittings

The following length equivalents are for use when figuring vent 
length. See the examples in “Recommended Vent Length.”

Roof venting

Roof cap

Wall venting

Wall cap

A. Roof cap
B. 6" (15.2 cm) min. diameter round vent

C. Elbow (for wall venting only)
D. Wall cap

E. 3

¹⁄₄

" x 10" to 6" (8.3 x 25.4 cm to 15.2 cm) 

rectangular to round transition piece

F. Vent extension piece, at least 3" (7.6 cm) high

A. Rectangular to round transition piece: 3

¹⁄₄

" x 10" to 6" = 5 ft

(8.3 x 25.4 cm to 15.2 cm = 1.5 m)

B. Roof cap: 3

¹⁄₄

" x 10" = 24 ft (8.3 x 25.4 cm = 7.3 m)

C. 90° elbow: 3

¹₄

" x 10" = 25 ft (8.3 x 25.4 cm = 7.6 m)

D. 90° elbow: 6" = 10 ft (15.2 cm = 3 m)

E. Wall cap: 3

¹⁄₄

" x 10" = 40 ft (8.3 x 25.4 cm = 12.2 m)

F. 45° elbow: 6" = 5 ft (15.2 cm = 1.5 m)

G. 90° flat elbow: 3

¹⁄₄

" x 10" = 10 ft (8.3 x 25.4 cm = 3 m)

A

B

C

E

F

D

3" (7.6 cm)

A                           B                            C

D                  E                    F               G

Содержание AMV1160VA

Страница 1: ...ounting Plate to Wall 8 Prepare Upper Cabinet 8 Install Damper Assembly 9 Install the Microwave Oven 9 Complete Installation 10 VENTING DESIGN SPECIFICATIONS 11 ASSISTANCE 12 Replacement Parts 12 Accessories 12 W10238252A You can be killed or seriously injured if you don t immediately You can be killed or seriously injured if you don t follow All safety messages will tell you what the potential ha...

Страница 2: ... left sidewall make sure there is at least 6 15 2 cm of clearance between the wall and the microwave oven so that the door can open fully Some cabinet and building materials are not designed to withstand the heat produced by the microwave oven for cooking Check with your builder or cabinet supplier to make sure that the materials used will not discolor delaminate or sustain other damages Special R...

Страница 3: ...ground prong Do not use an adapter Do not use an extension cord Failure to follow these instructions can result in death fire or electrical shock WARNING GROUNDING INSTRUCTIONS SAVE THESE INSTRUCTIONS For all cord connected appliances The microwave oven must be grounded In the event of an electrical short circuit grounding reduces the risk of electric shock by providing an escape wire for the elec...

Страница 4: ...r wall or roof venting changes must be made to the venting system NOTE Skip this section if you are using recirculation installation Keep the damper assembly in case the venting method is changed or the microwave oven is reinstalled in another location where wall or roof venting may be used Wall Venting Installation Only 1 Remove screws attaching damper plate to top of microwave oven exterior Slid...

Страница 5: ...tor back into microwave oven IMPORTANT If blower motor is not positioned with flat sides facing the back of the microwave oven as shown performance will be poor 6 Reattach blower motor to back of microwave oven with 2 screws removed in Step 3 of Wall Venting Installation Only Securely tighten screws NOTE If blower motor is not correctly oriented the 2 screws removed in Step 3 cannot be reattached ...

Страница 6: ...ctions show examples of preferred installation configurations with the mounting plate No Wall Studs at End Holes Figure 1 No Wall Studs at End Holes Figure 2 NOTE If wall stud is within 6 15 2 cm of the vertical centerline see Mark Rear Wall section only recirculation or roof venting installation can be done Wall Stud at One End Hole Figure 3 Wall Studs at Both End Holes Figure 4 A End holes on mo...

Страница 7: ...losest to the wall stud centerline s See figures 1 2 and or 3 in Possible Wall Stud Configurations in Locate Wall Stud s section The blackened holes in the shaded areas are ideal hole locations 7 Set the mounting plate aside Wall Venting Installation Only 8 Mark the centerline 3 8 1 cm down from the bottom edge of the upper cabinet 9 Using measuring tape measure out 6 15 2 cm on both sides of the ...

Страница 8: ...ing plate facing forward insert a 1 4 20 x 3 round head bolt through the end hole that fits over the 3 4 19 mm hole drilled in Step 3 of Installation for Wall Stud at One End Hole in the Drill Holes in Rear Wall section 2 Start a toggle nut on the bolt from the back of the mounting plate Leave enough space for the toggle nut to go through the wall and to open 3 Position mounting plate on the wall ...

Страница 9: ...e of the microwave oven is the heavy side Handle the microwave oven gently 1 Place a washer on each 1 4 20 x 3 flat head bolt and place inside upper cabinet near the 3 8 10 mm holes 2 Make sure the microwave oven door is closed and taped shut 3 Using 2 or more people lift microwave oven and hang it on support tabs at the bottom of mounting plate NOTE To avoid damage to the microwave oven do not gr...

Страница 10: ...ecure with sheet metal screw NOTE The screw cannot be installed if the damper assembly is not positioned as shown 2 Connect vent to damper assembly Complete Installation 1 Install filters Refer to the User Instructions for filter placement 2 Plug microwave oven into grounded 3 prong outlet 3 Reconnect power 4 Check the operation of microwave oven by placing 1 cup 250 mL of water on the turntable a...

Страница 11: ...amper to open fully If venting through the roof and rectangular to round transition is used be sure there is at least 3 7 6 cm of clearance between the top of the microwave oven and the transition piece See Rectangular to Round Transition illustration Rectangular to Round Transition NOTE The minimum 3 7 6 cm clearance must exist between the top of the microwave oven and the rectangular to round tr...

Страница 12: ...en If you need additional assistance call us at our toll free number or visit our website listed in the User Instructions Replacement Parts If any of the installation hardware needs to be replaced call us at our toll free number listed in the User Instructions Following is a list of available replacement parts You will need your model number located on the front facing of the microwave oven openin...

Отзывы: